Worked example
Clay with single-sided drainage
A clay layer is drained at its top and underlain by nearly impermeable material.
Results
Edit inputs ↓- Settlement
- 114.57 mm
- OCR
- 1.25
- Time to 50%
- 221.3 days
- Time to 90%
- 954.1 days
- Compression
- Time response
- Target
Loading crosses preconsolidation pressure. Both compression slopes contribute.
Calculation details
| Stress path | OC → NC |
|---|---|
| Final effective stress | 118 kPa |
| Final void ratio | 0.949 |
| Recompression settlement | 11.99 mm |
| Virgin compression settlement | 102.57 mm |
| Longest drainage path Hdr | 4.5 m |
| Target time factor Tv | 0.8481 |
| Time to target | 954.1 days |
| Settlement at target | 103.11 mm |
GeotechSoilLab · Screening sheet · Metric SI
Clay with single-sided drainage
| Layer thickness H₀ | 4.5 m |
|---|---|
| Initial void ratio e₀ | 1 |
| Initial stress σ′₀ | 68 kPa |
| Preconsolidation σ′p | 85 kPa |
| Added stress Δσ′ | 50 kPa |
| Compression index Cc | 0.32 |
| Recompression Cr | 0.055 |
| Drainage faces | Single |
| Consolidation rate cv | 0.018 m²/day |
| Target consolidation U | 90 % |
| Settlement | 114.57 mm |
|---|---|
| OCR | 1.25 |
| Time to 50% | 221.3 days |
| Time to 90% | 954.1 days |
| Stress path | OC → NC |
| Final effective stress | 118 kPa |
| Final void ratio | 0.949 |
| Recompression settlement | 11.99 mm |
| Virgin compression settlement | 102.57 mm |
| Longest drainage path Hdr | 4.5 m |
| Target time factor Tv | 0.8481 |
| Time to target | 954.1 days |
| Settlement at target | 103.11 mm |
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Engineering screening estimates. Use site-specific boring logs, appropriate test data and review by a licensed geotechnical PE before design or construction.
Worked result
The longest drainage path equals 4.5 m. The same layer with two drained faces would reach the target in a quarter of the time.
- Add 50 kPa to 68 kPa to get 118 kPa. The preconsolidation stress is 85 kPa.
- Add 11.993 mm of recompression and 102.573 mm of virgin compression to get 114.566 mm.
- Use Tv = 0.8481 and Hdr = 4.5 m in TvHdr²/cv. This gives 954.1 days to 90% consolidation.
Settlement114.57 mmOCR1.25Time to 50%221.3 daysTime to 90%954.1 days
Original case inputs
| Layer thickness H₀ | 4.5 m |
|---|---|
| Initial void ratio e₀ | 1 |
| Initial stress σ′₀ | 68 kPa |
| Preconsolidation σ′p | 85 kPa |
| Added stress Δσ′ | 50 kPa |
| Compression index Cc | 0.32 |
| Recompression Cr | 0.055 |
| Drainage faces | Single |
| Consolidation rate cv | 0.018 m²/day |
| Target consolidation U | 90 % |
Method & assumptions
- OCR = σ′p / σ′₀. Settlement is H₀/(1 + e₀) times the decrease in void ratio. Use Cr log₁₀(σ′/σ′₀) up to σ′p and Cc log₁₀(σ′/σ′p) beyond it.
- For normally consolidated clay, σ′p equals σ′₀ and the full stress increment follows Cc. Overconsolidated clay uses only Cr when final stress stays below or at σ′p.
- t = Tv Hdr² / cv. Hdr is H₀ for single drainage or H₀/2 for double drainage. Tv is found from Terzaghi’s average consolidation series and its short-time limit.
- Use a representative initial stress and added stress at the layer midpoint. The method assumes one homogeneous saturated layer, one-dimensional strain, sudden loading and constant cv. Compute separate layers when properties vary.
More worked examples
- Normally consolidated clay under fillAn embankment loads a normally consolidated clay layer bounded by permeable sand.
- Overconsolidated clay below yieldA modest foundation pressure increment leaves final stress below the soil’s prior maximum.
- Clay compressed past preconsolidationA heavy fill increment pushes an overconsolidated clay through its yield stress.
- Loading that reaches preconsolidation stressA staged load raises the effective stress exactly to the estimated preconsolidation stress.
- Time to 95% consolidationA staging study checks the estimated time to reach 95% primary consolidation for a thick layer.