GroundGridLab · IEC 62305-3 · NFPA 780
LPL I rooftop equipment
A rooftop structure is used as a flat datum for two equal air terminals. The smaller 20 m sphere screens a duct at midspan.
Clearance checks met. Compare centerline clearance and the available separation against the simplified model.
- Sphere radius
- 20 m
- Single-mast reach
- 2.2238 m
- Midspan clearance
- 0.030303 m
- Required separation
- 0.32 m
Inputs
| Lightning protection level | IEC LPL I |
|---|---|
| Equal mast height | 5 m |
| Object height above datum | 3.3 m |
| Mast center spacing | 16 m |
| Current sharing k꜀ | 0.5 × |
| Insulating material kₘ | 1 × |
| Length to bonding point | 8 m |
| Available separation | 0.5 m |
Derived values
| Midspan sag | 1.6697 m |
|---|---|
| Midspan envelope height | 3.3303 m |
| Single mast effective height | 5 m |
| Span must be below | 40 m |
| Separation margin | 0.18 m |
| Lightning protection factor kᵢ | 0.08 × |
Evaluate the whole site in 3D, including roof edges, sides, other strike points and current paths. The separation-distance screen uses simplified IEC factors.