GroundGridLab · IEC 62305-3 · NFPA 780
LPL III industrial yard
Two taller masts flank an outdoor steel structure. The worksheet compares strike geometry and a separate down-path separation check.
Clearance checks met. Compare centerline clearance and the available separation against the simplified model.
- Sphere radius
- 45 m
- Single-mast reach
- 6.8225 m
- Midspan clearance
- 2.7995 m
- Required separation
- 1.12 m
Inputs
| Lightning protection level | IEC LPL III |
|---|---|
| Equal mast height | 20 m |
| Object height above datum | 12 m |
| Mast center spacing | 42 m |
| Current sharing k꜀ | 0.7 × |
| Insulating material kₘ | 0.5 × |
| Length to bonding point | 20 m |
| Available separation | 1.2 m |
Derived values
| Midspan sag | 5.2005 m |
|---|---|
| Midspan envelope height | 14.799 m |
| Single mast effective height | 20 m |
| Span must be below | 90 m |
| Separation margin | 0.08 m |
| Lightning protection factor kᵢ | 0.04 × |
Evaluate the whole site in 3D, including roof edges, sides, other strike points and current paths. The separation-distance screen uses simplified IEC factors.