HeatExchangerLab

Low-Reynolds syrup shell screen

A warm syrup retains a high bulk viscosity at the proposed operating point.

Segmental baffle cutaway

Aₛ = DₛB(p − Dₒ)/p · Nu = 0.36 Re⁰·⁵⁵ Pr¹ᐟ³ (μ/μwall)⁰·¹⁴

Edit inputs ↓
Crossflow area
0.0228m²
Shell velocity
0.35088m/s
Shell hₒ
741.06W/(m²·K)
Shell ΔP
21.219kPa
Segmental baffle cutawaySHELL INLET →SEGMENTAL CUT19 baffles30 % of shell IDB/Dₛ 0Spacing windowB/Dₛ 1.35
The baffle cut sets the drawn window. The spacing marker shows the entered B/Dₛ compared with the screening band.
  • Shell Reynolds number is outside the 2,000–1,000,000 Kern heat-transfer range.
  • Kern coefficients use the nominal 25% cut. The window geometry reflects the entered cut.

Inputs

m
m
%
m
L/min
kg/m³
mPa·s
mPa·s
W/(m·K)
kJ/(kg·K)

Calculated results

Bundle crossflow area
0.0228 m²
Crossflow velocity
0.35088 m/s
Shell-side film hₒ
741.06 W/(m²·K)
Shell-side pressure drop
21.219 kPa
Equivalent diameter
22.121 mm
Shell Reynolds number
79.558
Gross baffle window
0.034957 m²
Estimated segmental baffles
19
Crossflow sections
20
Shell mass flux
431.58 kg/(m²·s)
Prandtl number
866.34
Kern friction factor
0.7745
Baffle spacing / shell ID
0.45238
Screening minimum spacing
0.084 m

Worked solution

Preset calculation · Metric SI

  1. From the shell bore, spacing, and clear pitch, find 0.0228 m² available for crossflow.
  2. Use the pitch cell to obtain a hydraulic equivalent diameter of 22.121 mm and Reynolds number of 79.558.
  3. Apply the Kern screen across 20 sections to estimate 741.06 W/(m²·K) for hₒ and 21.219 kPa for pressure loss.

The Reynolds warning identifies extrapolation. Compare the available crossflow area before relying on the heat-transfer estimate.

Calculation basis

Kern crossflow area uses the notional tube row at the shell equator. Equivalent diameter comes from the open area and wetted perimeter of a square or triangular pitch cell.

The 25% nominal baffle-cut correlation estimates shell-side hₒ and pressure drop. The entered cut changes the gross segment window and diagram. Leakage, bypass, window obstructions, and nozzle losses require a more detailed method.

The spacing screen runs from the larger of 0.2Dₛ and 50 mm to Dₛ. Maximum unsupported length and vibration depend on the actual tube material and layout.

Methodology and references