Tube bundle and pass routing

ΔP = [f × (L/Dᵢ) × nₚ + 4(nₚ − 1)] × ρv²/2

Edit inputs ↓
Required tubes
162
Tube velocity
0.206m/s
Tube ΔP
4.4655kPa
Reynolds
49.819
Tube bundle and pass routing90° tube pitch1 pass · 162 tubes/pass0Liquid velocity3.6 m/s
The section shows a sample of the selected pitch lattice. The routing shows the selected number of tube passes.
  • Tube velocity is below the 0.9 m/s fouling screen.

Inputs

m
m²
m
mm
L/min
kg/m³
mPa·s
mm

Calculated results

Required tubes
162
Tube velocity
0.206 m/s
Tube-side pressure drop
4.4655 kPa
Tube Reynolds number
49.819
Estimated tubes that fit
277
Tubes per pass
162
Installed outside area
29.086 m²
Tube inside diameter
15.748 mm
Tube center pitch
23.812 mm
Straight tube loss
4.4655 kPa
Return pass loss
0 kPa
Darcy friction factor
1.2847

Worked solution

Preset calculation · Metric SI

  1. Divide the required area by the area per tube and round up to a complete pass grouping. The result is 162 tubes.
  2. Put the flow through 162 tubes per pass. The resulting tube speed and Reynolds number are 0.206 m/s and 49.819.
  3. Add 4.4655 kPa of straight loss and 0 kPa of return loss.

Verify that the friction factor follows 64/Re and that there is no return-pass loss.

Calculation basis

Required outside area divided by πDₒL gives the raw tube count. Round up to fill complete passes. Bundle capacity counts centers on the selected pitch lattice inside a circular limit after bundle clearance.

The bundle screen uses a centered lattice and omits pass-partition lanes, tie rods, and detailed tubesheet constraints. Confirm actual tube count with a layout drawing.

Straight loss uses Darcy–Weisbach with 64/Re for laminar flow and Haaland for turbulent flow. Add K = 4 per return pass. The default 0.9–2.4 m/s screening band is for initial liquid-service review.

Methodology and references