Starting estimate
On each day the 30 minute runtime is split into five 6 minute starts, with time between starts for water to soak in.
- Gross precipitation rate
- 1 in/h
- Starts per watering day
- 5
- Runtime per start
- 6 min
- Planning soak time between starts
- 60 min
How the estimate works
- Multiply the number of heads by the flow per head. Compare that zone demand with supply measured at the pressure the sprinklers require.
- Convert total discharge to water depth per hour over the zone area. Subtract effective rainfall from the target and divide the remaining depth by the precipitation rate.
- Spread the runtime across watering days and split each day into short starts using the selected soil preset. Check the schedule against catch-cup readings and runoff.
Questions and answers
Why split a 30 minute clay-soil run into five starts?
Dividing by the 7 minute planning maximum gives a little more than four. Five equal starts keep each run at about six minutes.
What if this clay lawn starts pooling before a six-minute run ends?
Shorten each run and increase starts as needed, or use a lower-precipitation nozzle. Observe the slope and actual soil response.