Worked example

Short sprinkler starts for a clay-soil zone

Four 2.5 gpm heads water a 962.5 ft² zone at about 1 in/hour. Deliver a 1 in weekly target over two clay-soil watering days.

Project inputs

Zone and supply
ft²
gpm
gpm
Weekly water plan
in
in

Material & layout estimate

Total weekly runtime

60 min
Zone flow demand
10 gpm
Supply margin
2 gpm
Gross precipitation rate
1 in/h
Water still needed
1 in
Starts per watering day
5
Runtime per start
6 min
Planning soak time between starts
60 min
Starts per week
10
Weekly zone water volume
600 US gal

Runtime uses an average over the entire zone. Confirm it with a catch-cup test and shorten cycles if runoff begins.

Zone flow & cycle-and-soak schedule Schematic
Zone flow & cycle-and-soak scheduleTotal weekly runtime: 60 min. Zone flow demand: 10 gpm. Supply margin: 2 gpm. Gross precipitation rate: 1 in/h ZONE FLOW BUDGET10 gpm4 heads at 2.5 gpm eachDemandAvailable supplyWithin entered supplyWEEKLY RUNTIME60 min1 in water still needed2 days × 5 starts per day6 min per start60 min soak between starts

Starting estimate

On each day the 30 minute runtime is split into five 6 minute starts, with time between starts for water to soak in.

Gross precipitation rate
1 in/h
Starts per watering day
5
Runtime per start
6 min
Planning soak time between starts
60 min

How the estimate works

  1. Multiply the number of heads by the flow per head. Compare that zone demand with supply measured at the pressure the sprinklers require.
  2. Convert total discharge to water depth per hour over the zone area. Subtract effective rainfall from the target and divide the remaining depth by the precipitation rate.
  3. Spread the runtime across watering days and split each day into short starts using the selected soil preset. Check the schedule against catch-cup readings and runoff.

Questions and answers

Why split a 30 minute clay-soil run into five starts?

Dividing by the 7 minute planning maximum gives a little more than four. Five equal starts keep each run at about six minutes.

What if this clay lawn starts pooling before a six-minute run ends?

Shorten each run and increase starts as needed, or use a lower-precipitation nozzle. Observe the slope and actual soil response.