Worked example

A sprinkler zone that exceeds the measured supply

Nine heads at 2 gpm each need 18 gpm. The main supplies 14 gpm at the required pressure for a 1,443.75 ft² zone.

Project inputs

Zone and supply
ft²
gpm
gpm
Weekly water plan
in
in

Material & layout estimate

Total weekly runtime

30 min
Zone flow demand
18 gpm
Supply margin
-4 gpm
Gross precipitation rate
1.2 in/h
Water still needed
0.6 in
Starts per watering day
1
Runtime per start
15 min
Planning soak time between starts
0 min
Starts per week
2
Weekly zone water volume
540 US gal

Zone demand exceeds the entered supply at operating pressure. Reduce demand or split into zones before using the estimated runtime.

Zone flow & cycle-and-soak schedule Schematic
Zone flow & cycle-and-soak scheduleTotal weekly runtime: 30 min. Zone flow demand: 18 gpm. Supply margin: -4 gpm. Gross precipitation rate: 1.2 in/h ZONE FLOW BUDGET18 gpm9 heads at 2 gpm eachDemandAvailable supplyDemand exceeds supplyWEEKLY RUNTIME30 min0.6 in water still needed2 days × 1 starts per day15 min per start

Starting estimate

The nominal runtime assumes the head flows are achieved. Solve the 4 gpm deficit before programming a real controller from this estimate.

Total weekly runtime
30 min
Zone flow demand
18 gpm
Supply margin
-4 gpm
Gross precipitation rate
1.2 in/h

How the estimate works

  1. Multiply the number of heads by the flow per head. Compare that zone demand with supply measured at the pressure the sprinklers require.
  2. Convert total discharge to water depth per hour over the zone area. Subtract effective rainfall from the target and divide the remaining depth by the precipitation rate.
  3. Spread the runtime across watering days and split each day into short starts using the selected soil preset. Check the schedule against catch-cup readings and runoff.

Questions and answers

Does a negative 4 gpm supply margin change actual sprinkler coverage?

It can reduce pressure, flow, and head reach. Rebalance the nozzles or split the zone, then use measured performance for runtime.

Can these nine heads all be changed to lower-flow nozzles?

Check pressure, arc, spacing, and precipitation match across the zone. Enter the proposed flow and confirm actual coverage after installation.