Starting estimate
The nominal runtime assumes the head flows are achieved. Solve the 4 gpm deficit before programming a real controller from this estimate.
- Total weekly runtime
- 30 min
- Zone flow demand
- 18 gpm
- Supply margin
- -4 gpm
- Gross precipitation rate
- 1.2 in/h
How the estimate works
- Multiply the number of heads by the flow per head. Compare that zone demand with supply measured at the pressure the sprinklers require.
- Convert total discharge to water depth per hour over the zone area. Subtract effective rainfall from the target and divide the remaining depth by the precipitation rate.
- Spread the runtime across watering days and split each day into short starts using the selected soil preset. Check the schedule against catch-cup readings and runoff.
Questions and answers
Does a negative 4 gpm supply margin change actual sprinkler coverage?
It can reduce pressure, flow, and head reach. Rebalance the nozzles or split the zone, then use measured performance for runtime.
Can these nine heads all be changed to lower-flow nozzles?
Check pressure, arc, spacing, and precipitation match across the zone. Enter the proposed flow and confirm actual coverage after installation.