Worked example

A 1,925 ft² sprinkler zone at half an inch per hour

Five heads use 2 gpm each over a 1,925 ft² zone. Enter 0.25 in of effective rain against a 1 in target and three watering days on loam.

Project inputs

Zone and supply
ft²
gpm
gpm
Weekly water plan
in
in

Material & layout estimate

Total weekly runtime

90 min
Zone flow demand
10 gpm
Supply margin
2 gpm
Gross precipitation rate
0.5 in/h
Water still needed
0.75 in
Starts per watering day
3
Runtime per start
10 min
Planning soak time between starts
45 min
Starts per week
9
Weekly zone water volume
900 US gal

Runtime uses an average over the entire zone. Confirm it with a catch-cup test and shorten cycles if runoff begins.

Zone flow & cycle-and-soak schedule Schematic
Zone flow & cycle-and-soak scheduleTotal weekly runtime: 90 min. Zone flow demand: 10 gpm. Supply margin: 2 gpm. Gross precipitation rate: 0.5 in/h ZONE FLOW BUDGET10 gpm5 heads at 2 gpm eachDemandAvailable supplyWithin entered supplyWEEKLY RUNTIME90 min0.75 in water still needed3 days × 3 starts per day10 min per start45 min soak between starts

Starting estimate

The zone needs 90 minutes per week. That is 30 minutes per watering day, divided into three starts of 10 minutes.

Total weekly runtime
90 min
Gross precipitation rate
0.5 in/h
Starts per watering day
3
Runtime per start
10 min

How the estimate works

  1. Multiply the number of heads by the flow per head. Compare that zone demand with supply measured at the pressure the sprinklers require.
  2. Convert total discharge to water depth per hour over the zone area. Subtract effective rainfall from the target and divide the remaining depth by the precipitation rate.
  3. Spread the runtime across watering days and split each day into short starts using the selected soil preset. Check the schedule against catch-cup readings and runoff.

Questions and answers

Why does the half-inch-per-hour zone need 90 minutes this week?

The 1 in target loses 0.25 in to effective rain. At 0.5 in per hour, applying the remaining 0.75 in takes 1.5 hours.

Do three ten-minute starts run back to back on the loam example?

Space starts using the entered soil’s planning soak interval, then adjust if a catch-cup and runoff check suggest shorter or longer gaps.