Worked example

Set a 2% patio grade over 16 ft

Check a 16 ft patio run by entering a 3.84 in fall. The example patio band is 1.5–2.5%.

Project inputs

Survey and comparison bands
ft
in
Use a negative number if the outlet end is higher.
%
%
%
%
French drain section
in
in
Enter the stone section only. Exclude a soil or sod cap.
in
in
%

Material & layout estimate

Grade toward outlet

2%
Slope angle
1.15°
Vertical to horizontal ratio
1 : 50
Lawn grade check
Within band
Patio grade check
Within band
#57 washed stone to order
0.81 yd³
Gross stone section volume
0.79 yd³
Perforated pipe length
16 ft
Fabric cut width including lap
68 in
Geotextile to wrap the trench
90.68 ft²

Check the actual pipe invert fall and approved outlet separately. Local drainage and accessibility requirements may differ from the comparison bands.

Slope profile & drain trench Schematic
Slope profile & drain trenchGrade toward outlet: 2%. Slope angle: 1.15°. Vertical to horizontal ratio: 1 : 50. Lawn grade check: Within band RUN / DROP2%StartOutlet16 ft horizontal run3.84 in dropFRENCH DRAIN SECTION0.81 yd³12 in trench width4 in perforated pipe

Starting estimate

A 2% grade drops 2 ft per 100 ft, or 3.84 in across 16 ft. Compare the actual patio design with applicable access and drainage criteria.

Grade toward outlet
2%
Vertical to horizontal ratio
1 : 50
Patio grade check
Within band

How the estimate works

  1. Divide the signed drop by the horizontal run in matching units. Multiply by 100 for percent grade or use the arctangent for degrees.
  2. Subtract the cross-sectional area displaced by the pipe from the trench’s stone section. Multiply by the sloped length, then add the order allowance.
  3. Estimate the fabric cut width from the trench perimeter plus the lap. Use that width times the drain length for one continuous wrap.

Questions and answers

What should each foot of the 2% patio run drop?

Two percent of a foot is 0.24 inches. Multiplying by sixteen feet gives 3.84 inches.

Can I measure the patio drop using a string set level?

Yes. Set a level reference and measure vertically to each paired point. Use the elevation difference along the actual drainage direction.