Worked example

Heel tension in a slender dam

A preliminary 16 m tall section has a 7.2 m base, a 2.2 m crest and 14 m of reservoir depth with full uplift.

Results ↓

Inputs

Monolith geometry
m
m
m
m
kN/m³
Water & uplift
m
m
Silt, base & seismic loads
m
kN/m³
kPa

Hydraulic readout

Sliding resistance exceeded

Sliding FS: 0.88231, Overturning FS: 1.19023, Heel pressure: -198.934 kPa, Toe pressure: 549.822 kPa

Gravity dam force section and foundation pressuresHydrostatic thrust diagrams, the resultant and the middle-third area are shown in section. The adjacent panel shows uplift above and bearing pressures below.SLIDING FS0.88231OVERTURN FS1.1902HEEL PRESSURE-198.93 kPaTOE PRESSURE549.82 kPaMonolith and resultantThrustKernelBaseUplift & linear bearingUpliftBearingTensionResultant · middle thirde = 2.5607 m
  • Heel tension indicates loss of contact. Recompute uplift and stresses with a cracked-base model.
  • Linear bearing stresses assume full rigid contact. Load combinations, foundation capacity and cracked-base uplift require separate checks.

Calculation details

Eccentricity toward toe
2.56067 m
Kern half-width B/6
1.2 m
Resultant from heel
6.16067 m
Concrete weight
1,774.72 kN
Reservoir thrust
961.052 kN
Tailwater thrust
1.22583 kN
Tailwater downward force
0.383072 kN
Total uplift
511.907 kN
Silt thrust
3.4155 kN
Dam inertia
0 kN
Westergaard thrust
0 kN
Net vertical force
1,263.2 kN
Net downstream force
963.241 kN
Resisting toe moment
8,214.28 kN·m
Overturning toe moment
6,901.41 kN·m
Net toe moment
1,312.88 kN·m

Interpreting this example

Negative linear heel pressure signals contact loss. The listed pressure pair gives the full-contact trial for a follow-up cracked-base analysis.

FSs = (μΣV + c B w)/ΣH · e = B/2 − Mnet/ΣV · σ = ΣV/(Bw) (1 ± 6e/B)

A vertical upstream face and a straight downstream batter define the cross section. The solver integrates piecewise linear uplift and includes tailwater’s horizontal and vertical components. Positive eccentricity points downstream.

Kernel and force balance are initial screens for a single load case. Verify regulatory load combinations, drain performance, material strengths and foundation response with qualified dam-safety review.

Worked examples

Open a case to load its inputs and interpretation.

All cases →