Worked example
Lane screening on hard clay
A short hydraulic structure on hard clay has a 9.8 m floor, two shallow cutoffs and 1.7 m net head.
Inputs
Hydraulic readout
Cohesive uplift review
Unit seepage: 1.7e-8 m²/s, Lane ratio: 5.56863, Exit gradient: 0.244253, Boiling FS: 3.65151
Input values
- Net hydraulic head ΔH
- 1.7 m
- Permeability k
- 3e-8 m/s
- Flow channels Nf
- 4
- Equipotential drops Nd
- 12
- Exit element thickness Δl
- 0.58 m
- Floor length
- 9.8 m
- Upstream cutoff depth
- 1.3 m
- Downstream cutoff depth
- 1.8 m
- Creep length basis
- Floor and cutoffs
- Lane material screen
- Hard clay · 1.8
- Grain specific gravity Gₛ
- 2.65
- Void ratio e
- 0.85
- Use an independently drawn flow net for homogeneous, isotropic seepage. Lane’s ratio screens empirical piping progression.
- The granular quick-condition factor is illustrative for cohesive material. Check cohesive blanket uplift separately.
Calculation details
- Lane material threshold
- 1.8
- Critical gradient
- 0.891892
- Target boiling factor
- 4
- Mean floor head gradient
- 0.173469
- Head drop per element
- 0.141667 m
- Heel uplift above tailwater
- 16.6713 kPa
- Horizontal creep
- 9.8 m
- Vertical creep
- 6.2 m
Interpreting this example
The historic creep threshold is shown for the material. Assess cohesive uplift separately from the granular quick-condition calculation.
q = k ΔH Nf/Nd · Cw = (ΣLₕ/3 + ΣLᵥ)/ΔH · FS = [(Gₛ − 1)/(1 + e)] / iₑ
The last equipotential drop divided by its local spacing estimates the exit gradient. Lane’s method assigns a one-third weight to horizontal paths and full weight to vertical paths.
The USBR 4.0 exit-gradient screen is for cohesionless quick conditions in new or remedial dam work. Filters, uplift, stratification, anisotropy and concentrated leakage require separate checks.
Worked examples
Open a case to load its inputs and interpretation.
- Cutoff weir on very fine sandA 24 m floor and two cutoff walls act across 2.7 m of net head. The interpreted flow net has 4 channels and 16 drops.
- Short exit element and boil riskA downstream sheet pile has a last equipotential spacing of only 0.12 m under 3.6 m of net head with 14 drops.
- Measured foundation creep pathAs-built dimensions give 31 m of horizontal path and 15 m of vertical path through a medium-sand foundation.
- Conservative fine-sand screenA 35 m floor with shallow cutoffs was assessed under a 2.95 m head. Select the project’s conservative 8.5 creep requirement.