Foundations

Darcy Seepage, Lane Creep & Piping Calculator

Estimate flow-net seepage, weighted Lane creep ratio and exit-gradient piping or boiling factor of safety beneath a structure.

Results ↓

Inputs

Flow net
m
m/s
m
Foundation geometry
m
m
m
Material

Hydraulic readout

Both seepage screens pass

Unit seepage: 1.6875e-5 m²/s, Lane ratio: 9.40741, Exit gradient: 0.196221, Boiling FS: 5.0656

Foundation seepage and exit-gradient screensThe illustrative flow net wraps under the cutoff walls. Right-hand bars compare the exit gradient and weighted creep ratio with their screening thresholds.UNIT SEEPAGE1.6875e-5 m²/sLANE RATIO9.4074EXIT GRADIENT0.19622BOILING FS5.0656Cutoffs & schematic flow netFlowlinesDropsExitPiping and creep checksExit / critical gradientLane / material limitThresholdPassReviewExit gradient safety factor5.0656 / 4.0
  • Use an independently drawn flow net for homogeneous, isotropic seepage. Lane’s ratio screens empirical piping progression.

Calculation details

Lane material threshold
8.5
Critical gradient
0.993976
Target boiling factor
4
Mean floor head gradient
0.1125
Head drop per element
0.16875 m
Heel uplift above tailwater
26.478 kPa
Horizontal creep
24 m
Vertical creep
17.4 m

Calculation method

q = k ΔH Nf/Nd · Cw = (ΣLₕ/3 + ΣLᵥ)/ΔH · FS = [(Gₛ − 1)/(1 + e)] / iₑ

The last equipotential drop divided by its local spacing estimates the exit gradient. Lane’s method assigns a one-third weight to horizontal paths and full weight to vertical paths.

The USBR 4.0 exit-gradient screen is for cohesionless quick conditions in new or remedial dam work. Filters, uplift, stratification, anisotropy and concentrated leakage require separate checks.

Worked examples

Open a case to load its inputs and interpretation.

Share worksheet