Cold runner and reject regrind credit

A heavy cold runner gives this job a meaningful regrind stream.

Edit inputs ↓

Inputs

Cycle and reject rate
s
s
s
s
%
Resin and regrind
g
g
USD/kg
%
%
Order and tooling
USD/h
USD
USD/part
Review calculations ↑
Good output
267.2parts/h
Cycle time
26s
Unit cost
0.8637USD/part
Machine hours
149.68h

Molding cycle and cost allocation

Live schematic
2 CAV · 132 g267.2 parts/hCYCLE TIME26 sFill 1.5 sHold 6 sCool 14 sEject 4.5 sUNIT COSTUSD 0.8637ResinMachineTooling

Quote covers unit cost

0%100% of quote125%+

Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.

Calculation details
Shot mass132 g
Gross resin per good part0.2325 USD/part
Regrind credit per good part0.0369 USD/part
Net resin per good part0.1956 USD/part
Machine per good part0.3181 USD/part
Tooling per good part0.35 USD/part
Order production cost34,547.61 USD
Quote margin per part0.7363 USD/part
Tooling payback quantity12,888

Working through the example

Only runners and rejected parts feed the regrind credit. Each recovered kilogram is credited at 70% of virgin value.

Good parts/h = 3600 × N × (1−scrap)/t_cycle. Tooling per part = CapEx/quantity. Payback parts = ceil[CapEx/(price − variable cost)].

Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.

Methodology and sources