Four-cavity ABS production quote

A 100,000-part order spreads the cost of a four-cavity tool.

Edit inputs ↓

Inputs

Cycle and reject rate
s
s
s
s
%
Resin and regrind
g
g
USD/kg
%
%
Order and tooling
USD/h
USD
USD/part
Review calculations ↑
Good output
542.8parts/h
Cycle time
26s
Unit cost
0.527USD/part
Machine hours
184.24h

Molding cycle and cost allocation

Live schematic
4 CAV · 139 g542.8 parts/hCYCLE TIME26 sFill 1.5 sHold 6 sCool 14 sEject 4.5 sUNIT COSTUSD 0.527ResinMachineTooling

Quote covers unit cost

0%100% of quote125%+

Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.

Calculation details
Shot mass139 g
Gross resin per good part0.094 USD/part
Regrind credit per good part0.0036 USD/part
Net resin per good part0.0904 USD/part
Machine per good part0.1566 USD/part
Tooling per good part0.28 USD/part
Order production cost52,699.61 USD
Quote margin per part0.323 USD/part
Tooling payback quantity46,435

Working through the example

Use good parts per hour after scrap to allocate machine cost. Add resin after runner credit and the per-part tooling allocation.

Good parts/h = 3600 × N × (1−scrap)/t_cycle. Tooling per part = CapEx/quantity. Payback parts = ceil[CapEx/(price − variable cost)].

Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.