Low-volume bridge tool amortization

A 500-part order absorbs the cost of a low-cavity bridge tool.

Edit inputs ↓

Inputs

Cycle and reject rate
s
s
s
s
%
Resin and regrind
g
g
USD/kg
%
%
Order and tooling
USD/h
USD
USD/part
Review calculations ↑
Good output
100.8parts/h
Cycle time
34.3s
Unit cost
13.3491USD/part
Machine hours
4.96h

Molding cycle and cost allocation

Live schematic
1 CAV · 43 g100.8 parts/hCYCLE TIME34.3 sFill 1.3 sHold 8 sCool 20 sEject 5 sUNIT COSTUSD 13.3491ResinMachineTooling

Quote below unit cost

0%100% of quote125%+

Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.

Calculation details
Shot mass43 g
Gross resin per good part0.1187 USD/part
Regrind credit per good part0.0132 USD/part
Net resin per good part0.1055 USD/part
Machine per good part0.8436 USD/part
Tooling per good part12.4 USD/part
Order production cost6,674.54 USD
Quote margin per part-7.8491 USD/part
Tooling payback quantity1,363

Working through the example

Tooling alone costs USD 12.40 per good part on this order. The quote can have positive contribution while falling short of full order cost.

Good parts/h = 3600 × N × (1−scrap)/t_cycle. Tooling per part = CapEx/quantity. Payback parts = ceil[CapEx/(price − variable cost)].

Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.