Good output 148.7 parts/h
Cycle time 45.5 s
Unit cost 1.88 USD/part
Machine hours 537.83 h
Molding cycle and cost allocation Live schematic
2 CAV · 135 g 148.7 parts/h CYCLE TIME 45.5 s Fill 2.5 s Hold 10 s Cool 28 s Eject 5 s UNIT COST USD 1.88 Resin Machine Tooling
Quote below unit cost
0% 100% of quote 125%+
Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.
Share link Reset defaults JSON CSV SVG PNG (2×) Print A4
Calculation details
Shot mass 135 g Gross resin per good part 0.8617 USD/part Regrind credit per good part 0 USD/part Net resin per good part 0.8617 USD/part Machine per good part 0.7933 USD/part Tooling per good part 0.225 USD/part Order production cost 150,399.53 USD Quote margin per part -1.08 USD/part Tooling payback quantity No positive contribution
Working through the example
Selling price is below resin plus press cost. Increasing quantity cannot cover the tooling at this contribution.
Good parts/h = 3600 × N × (1−scrap)/t_cycle. Tooling per part = CapEx/quantity. Payback parts = ceil[CapEx/(price − variable cost)].
Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.
Methodology and sources
C_unit = C_resin + C_press + CapEx ÷ order quantity
Inputs Cavities 2 Fill time 2.5 s Pack and hold time 10 s Additional cooling after hold 28 s Mold open, eject and close 5 s Part scrap rate 6 % Net part mass 62 g Runner and sprue mass per shot 11 g Virgin resin price 12 USD/kg Runner and rejects recovered 0 % Regrind value vs virgin price 65 % Press hourly rate 118 USD/h Tooling CapEx 18,000 USD Order quantity of good parts 80,000 Quoted selling price 0.8 USD/part
Results Good output 148.7 parts/h Cycle time 45.5 s Unit cost 1.88 USD/part Machine hours 537.83 h Shot mass 135 g Gross resin per good part 0.8617 USD/part Regrind credit per good part 0 USD/part Net resin per good part 0.8617 USD/part Machine per good part 0.7933 USD/part Tooling per good part 0.225 USD/part Order production cost 150,399.53 USD Quote margin per part -1.08 USD/part Tooling payback quantity No positive contribution
Quote below unit cost. Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.
2 CAV · 135 g 148.7 parts/h CYCLE TIME 45.5 s Fill 2.5 s Hold 10 s Cool 28 s Eject 5 s UNIT COST USD 1.88 Resin Machine Tooling
Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.