Quote below variable conversion cost

A slow process and premium resin make the quoted price unprofitable even at high volume.

Edit inputs ↓

Inputs

Cycle and reject rate
s
s
s
s
%
Resin and regrind
g
g
USD/kg
%
%
Order and tooling
USD/h
USD
USD/part
Review calculations ↑
Good output
148.7parts/h
Cycle time
45.5s
Unit cost
1.88USD/part
Machine hours
537.83h

Molding cycle and cost allocation

Live schematic
2 CAV · 135 g148.7 parts/hCYCLE TIME45.5 sFill 2.5 sHold 10 sCool 28 sEject 5 sUNIT COSTUSD 1.88ResinMachineTooling

Quote below unit cost

0%100% of quote125%+

Uses good parts after scrap. The break-even count divides tooling cost by selling price less variable cost.

Calculation details
Shot mass135 g
Gross resin per good part0.8617 USD/part
Regrind credit per good part0 USD/part
Net resin per good part0.8617 USD/part
Machine per good part0.7933 USD/part
Tooling per good part0.225 USD/part
Order production cost150,399.53 USD
Quote margin per part-1.08 USD/part
Tooling payback quantityNo positive contribution

Working through the example

Selling price is below resin plus press cost. Increasing quantity cannot cover the tooling at this contribution.

Good parts/h = 3600 × N × (1−scrap)/t_cycle. Tooling per part = CapEx/quantity. Payback parts = ceil[CapEx/(price − variable cost)].

Enter distinct cycle stages, counting only additional cooling after hold. Scrap is the average fraction of part impressions rejected. Regrind credit applies to recovered runner and rejected-part resin at the entered value fraction. Production hours are averages at steady operation. Add setup labor, downtime, packing, freight and any other quoted charges to your separate commercial estimate. Currency is USD in both measurement systems.

Methodology and sources