ASCE/SEI 7-16 §§13.3.1, 13.4 and Chapter 2

Nonstructural seismic force & anchorage

Calculate bounded component force, vertical seismic action, and uplift and shear demands on a symmetric two-row anchor group.

Calculation sheet
Export

Inputs

Component and attachment
g
ft
ft
Anchor group geometry
kip
ft
ft
Anchorage overstrength
Anchorage demand

Use 1 unless the attachment provision requires a higher factor.

LATERAL Fₚ
7.695kip
VERTICAL |Eᵥ|
1.026kip
LRFD UPLIFT
5.118kip
ASD UPLIFT
3.664kip

Attachment in elevationComponent attachmentz/h 0.75h 60 ftSkid free-body diagramAnchor row spacing↑ |Eᵥ| 1.03 kipFₚ 7.69 kipCG 3.2 ftUplift 5.12 kip
The elevation locates the component relative to the roof. The free-body sketch shows the horizontal force and vertical load path.

Calculation detail

Height ratio z/h
0.75
Unbounded Fₚ
7.695 kip
Minimum Fₚ
2.309 kip
Maximum Fₚ
12.312 kip
Governing Fₚ
Calculated Fₚ
Unfactored overturning
24.624 kip·ft
LRFD gravity stability factor
0.272
LRFD support contact
Uplift
ASD gravity stability factor
0.256
ASD support contact
Uplift
Demand on the two anchor rows
Load combinationNet gravity (kip)Uplift row (kip)Opposite row (kip)Shear / row (kip)
LRFD uplift3.8345.118403.8475
ASD uplift2.52183.663902.6932

How the calculation works

Calculate the horizontal force

Eq. 13.3-1 uses 0.4aₚSᴅₛWₚ(Iₚ/Rₚ)(1 + 2z/h). The result is bounded by 0.3SᴅₛIₚWₚ and 1.6SᴅₛIₚWₚ. The attachment-height ratio is at most 1.

Combine overturning and upward vertical action

The worksheet takes |Eᵥ| = 0.2SᴅₛWₚ. The simplified LRFD uplift case is 0.9D − Eᵥ + Eₕ. The ASD case is 0.6D − 0.7Eᵥ + 0.7Eₕ. A selectable horizontal multiplier is applied to the anchorage demand.

Resolve the anchor rows

For a centered component and rigid base, each row takes half the horizontal shear. The tension-side reaction is M divided by row spacing minus half the effective gravity. The gravity stability factor divides the stabilizing gravity moment by the overturning moment. A factor of 1 places the uplift row at the contact limit.

Design scope

Demand screening for a centered equipment skid on two symmetric anchor rows. Verify component classifications, governing combinations, attachment overstrength, capacities, interaction, eccentricity and prying separately.

Source references
  • ASCE/SEI 7-16 standardhttps://ascelibrary.org/doi/book/10.1061/9780784414248
  • FEMA P-1051 design exampleshttps://www.fema.gov/sites/default/files/2020-07/fema_nehrp-seismic-provisions-examples_p-1051_20160701.pdf

Worked examples