15 psig with 90% hot return
A large process plant sends 90% hot return to a 15 psig deaerator.
Inputs
Inputs
- Cold make-up flow
- 1,984.2 lb/hr
- Cold make-up temperature
- 68 °F
- Condensate return flow
- 17,857.4 lb/hr
- Condensate return temperature
- 222.8 °F
- Deaerator pressure
- 15 psig
- Pegging supply pressure
- 120 psig
- Vent / liquid outlet mass
- 0.15 %
- Boiler efficiency
- 82 %
Calculation results
- Mixed inlet temperature
- 207.42°F
- Deaerator saturation temperature
- 249.72°F
- Pegging steam required
- 900.2lb/hr
- Liquid feedwater outlet
- 20,710.7lb/hr
- Saturated vent vapor
- 31.1lb/hr
- Net boiler fuel-input relief
- 3.338MMBtu/h
- Preheat credit vs all-cold baseline
- 3,614,593.4Btu/h
- Boiler duty to generate pegging steam
- 877,152.58Btu/h
- Mixed inlet enthalpy
- 175.61Btu/lb
- Pegging inlet enthalpy
- 1,192.72Btu/lb
- Feedwater outlet enthalpy
- 218.33Btu/lb
- Vent vapor enthalpy
- 1,163.94Btu/lb
Calculation basis
- Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return) - Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*) - Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Check the original case
Compare net firing relief with the all-make-up case. The output accounts for steam spent on pegging.
- Pegging steam required900.2 lb/hr
- Liquid feedwater outlet20,710.7 lb/hr
- Deaerator saturation temperature249.72 °F
- Net boiler fuel-input relief3.338 MMBtu/h
Formulas and assumptions
Mixed inlet
h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return)
The dry supply steam throttles at constant enthalpy. The liquid mix temperature is found by inverting the liquid enthalpy equation.
Mass and energy
h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*)
The vent is r times liquid outlet mass, and the outlet is (m_in + m_peg)/(1 + r). Vent and liquid exit as saturated phases at the deaerator pressure. The energy and mass balances assume steady state and no shell loss.
Fuel-input relief
Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η
Compare at equal external water inflow against an all-cold baseline. The credit includes hot return and subtracts the boiler duty required for pegging. Use site venting and dissolved oxygen requirements for commissioning.
Worked examples
Open a case to edit its inputs.