Idealized zero-vent energy balance

An ideal zero-vent calculation isolates inlet mixing and sensible heating for a 12 psig vessel.

Inputs

lb/hr
°F
lb/hr
°F
psig
5–15 psig, equivalent to 0.345–1.034 bar g.
psig
%
%
Tray deaerator mass and enthalpy balance
Tray deaerator mass and enthalpy balancePEGGING 780.5 lb/hr. FEEDWATER 10.78K lb/hr. SAT TEMP 243.69 °F. FIRING RELIEF 0.885 MMBtu/hPEGGING780.5lb/hrFEEDWATER10.78Klb/hrSAT TEMP243.69°FFIRING RELIEF0.885MMBtu/hDEAERATOR TRAYSMAKE-UP WATERCONDENSATEVENT VAPORPEGGING STEAMFEEDWATER OUTPegging steam / external inlet mass7.8%0%Inlet heating burden25% scale
Live steam / heatCondensate / waterDischarge / loss

Calculation results

Mixed inlet temperature
167.65°F
Deaerator saturation temperature
243.69°F
Pegging steam required
780.5lb/hr
Liquid feedwater outlet
10,780.5lb/hr
Saturated vent vapor
0lb/hr
Net boiler fuel-input relief
0.885MMBtu/h
Preheat credit vs all-cold baseline
1,491,005Btu/h
Boiler duty to generate pegging steam
765,257.63Btu/h
Mixed inlet enthalpy
135.69Btu/lb
Pegging inlet enthalpy
1,192.72Btu/lb
Feedwater outlet enthalpy
212.22Btu/lb
Vent vapor enthalpy
1,161.84Btu/lb

Check the original case

Liquid outlet equals total inlet mass. The zero-vent case is a balance reference for comparison.

  • Pegging steam required780.5 lb/hr
  • Liquid feedwater outlet10,780.5 lb/hr
  • Deaerator saturation temperature243.69 °F
  • Net boiler fuel-input relief0.885 MMBtu/h

Formulas and assumptions

Mixed inlet

h_mix = (m_make·h_make + m_return·h_return)/(m_make + m_return)

The dry supply steam throttles at constant enthalpy. The liquid mix temperature is found by inverting the liquid enthalpy equation.

Mass and energy

h* = (h_f + r·h_g)/(1 + r); m_peg = m_in·(h* − h_mix)/(h_supply − h*)

The vent is r times liquid outlet mass, and the outlet is (m_in + m_peg)/(1 + r). Vent and liquid exit as saturated phases at the deaerator pressure. The energy and mass balances assume steady state and no shell loss.

Fuel-input relief

Net = [m_in·(h_f − h_make) − m_peg·(h_supply − h_f)]/η

Compare at equal external water inflow against an all-cold baseline. The credit includes hot return and subtracts the boiler duty required for pegging. Use site venting and dissolved oxygen requirements for commissioning.

Worked examples

Open a case to edit its inputs.