Near-saturation vented steam coil

A vented exchanger condenses at atmospheric pressure while heating process water to 96 °C.

Inputs

lb/hr
Btu/(lb·°F)
°F
°F
%
psig
psig
Shell-and-tube steam condensation
Shell-and-tube steam condensationSTEAM FLOW 1,219.1 lb/hr. HEATING DUTY 1.18M Btu/h. VALVE Cv 15.55 Cv. TRAP LOAD 2,438.1 lb/hrSTEAM FLOW1,219.1lb/hrHEATING DUTY1.18MBtu/hVALVE Cv15.55CvTRAP LOAD2,438.1lb/hrSTEAM INCONTROL VALVEPROCESS INPROCESS OUTCONDENSATEValve P₂ / P₁ absoluteChoked · 29.57%0%58% critical ratio100%
Live steam / heatCondensate / waterDischarge / loss

Calculation results

  • Small terminal temperature approach. Verify heat-transfer area and available differential pressure.
Design heating duty
1,182,651.02Btu/h
Process heating duty
1,028,392.19Btu/h
Condensing steam demand
1,219.1lb/hr
Screened trap capacity
2,438.1lb/hr
Trap capacity factor
2×
Required valve Cv
15.55Cv
Required valve Kv
13.45Kv
Valve flow regime
Choked
Valve P₂/P₁ absolute
29.57%
Condensing temperature
211.95°F
Steam latent heat
970.14Btu/lb
Terminal temperature approach
7.15°F

Check the original case

Review the small terminal temperature approach. Steam demand alone does not establish the exchanger area.

  • Condensing steam demand1,219.1 lb/hr
  • Design heating duty1,182,651.02 Btu/h
  • Required valve Cv15.55 Cv
  • Screened trap capacity2,438.1 lb/hr

Formulas and assumptions

Continuous or batch heat duty

Q = m·c_p·(T₂ − T₁)·(1 + allowance); m_batch,eq = mass·60/minutes

Use mass per hour for continuous operation or an equivalent hourly batch rate. The target temperature must stay below steam saturation in the exchanger.

Steam and trap load

m_steam = Q/h_fg(P₂); m_trap = factor·m_steam

Use 2× for a continuous screen and 3× for a batch startup screen. Confirm trap capacity at the minimum differential pressure and review exchanger stall.

Globe valve coefficient

X = min(0.42, 1 − P₂/P₁); Kv = m_steam/[12·P₁·√(X·(0.84 − X))/0.42]; Cv = 1.156·Kv

P₁ and P₂ are absolute bar and mass flow is kg/h. This is Spirax Eq. 3.21.2 normalized at zero drop, with choked flow at P₂ ≤ 0.58·P₁. Check valve noise, pressure recovery and capacity with the manufacturer.

Worked examples

Open a case to edit its inputs.