20 minute batch with heat allowance
A small cyclic tank has a 20 minute warm-up requirement and a 30% heat-loss allowance.
Inputs
Inputs
- Heating mode
- Batch warm-up
- Batch mass
- 3,417.2 lb
- Warm-up time
- 20 min
- Process fluid heat capacity
- 1 Btu/(lb·°F)
- Inlet or initial temperature
- 77 °F
- Outlet or target temperature
- 161.6 °F
- Heat loss margin
- 30 %
- Valve inlet pressure P₁
- 101.53 psig
- Condensing pressure P₂
- 50.76 psig
Calculation results
- Design heating duty
- 1,127,244.01Btu/h
- Process heating duty
- 867,110.78Btu/h
- Condensing steam demand
- 1,236.9lb/hr
- Screened trap capacity
- 3,710.6lb/hr
- Trap capacity factor
- 3×
- Required valve Cv
- 6.74Cv
- Required valve Kv
- 5.83Kv
- Valve flow regime
- Choked
- Valve P₂/P₁ absolute
- 56.32%
- Condensing temperature
- 298.43°F
- Steam latent heat
- 911.36Btu/lb
- Terminal temperature approach
- 136.83°F
Calculation basis
- Continuous or batch heat duty
Q = m·c_p·(T₂ − T₁)·(1 + allowance); m_batch,eq = mass·60/minutes - Steam and trap load
m_steam = Q/h_fg(P₂); m_trap = factor·m_steam - Globe valve coefficient
X = min(0.42, 1 − P₂/P₁); Kv = m_steam/[12·P₁·√(X·(0.84 − X))/0.42]; Cv = 1.156·Kv
Check the original case
Compare the base process duty and design duty to isolate the allowance.
- Condensing steam demand1,236.9 lb/hr
- Design heating duty1,127,244.01 Btu/h
- Required valve Cv6.74 Cv
- Screened trap capacity3,710.6 lb/hr
Formulas and assumptions
Continuous or batch heat duty
Q = m·c_p·(T₂ − T₁)·(1 + allowance); m_batch,eq = mass·60/minutes
Use mass per hour for continuous operation or an equivalent hourly batch rate. The target temperature must stay below steam saturation in the exchanger.
Steam and trap load
m_steam = Q/h_fg(P₂); m_trap = factor·m_steam
Use 2× for a continuous screen and 3× for a batch startup screen. Confirm trap capacity at the minimum differential pressure and review exchanger stall.
Globe valve coefficient
X = min(0.42, 1 − P₂/P₁); Kv = m_steam/[12·P₁·√(X·(0.84 − X))/0.42]; Cv = 1.156·Kv
P₁ and P₂ are absolute bar and mass flow is kg/h. This is Spirax Eq. 3.21.2 normalized at zero drop, with choked flow at P₂ ≤ 0.58·P₁. Check valve noise, pressure recovery and capacity with the manufacturer.
Worked examples
Open a case to edit its inputs.