Set a point load at 38% of a 31 ft span. The fixed-left support redistributes the reactions and creates a negative end moment.
Preliminary structural screening. A licensed SE/PE must review results against the complete project specifications.
ANSI/AISC 360-22F2 · F7 · G2 · G4
Inputs
LRFD
Use loads and strengths from the selected method. Re-enter values after switching methods.
Span response
Within modeled limits
Peak moment
799.056kip-ft
Peak shear
119.706kip
Total deflect.
0.4in
Available M
915kip-ft
Shear and moment use strength loads. The deflected shape uses total service load. Diagram ordinates are independently scaled.
Calculation results
Limit state
Demand
Available
Use
Flexural yielding
799.056 kip-ft
915 kip-ft
87.3%
Web shear
119.706 kip
368.46 kip
32.5%
Live deflection
0.267 in
1.033 in
25.8%
Total deflection
0.4 in
1.55 in
25.8%
Calculation values
Left reaction
119.706 kip
Right reaction
52.794 kip
Left end moment
-799.056 kip-ft
Live deflection
0.267 in
Plastic moment Mₚ
1,016.667 kip-ft
First-yield moment Mᵧ
887.5 kip-ft
Nominal shear Vₙ
368.46 kip
Shear area Aᵥ
12.282 in²
h/tw
52.7
Shear coefficient Cᵥ
1
Section inertia Iₓ
2,850 in⁴
Section yield stress Fᵧ
50 ksi
Flexural compactness
Compact
Available shear · LRFD
368.46 kip
Available shear · ASD
245.64 kip
Available bending · LRFD
915 kip-ft
Available bending · ASD
608.782 kip-ft
SteelBeamLab / AISC 360-22 F2 · F7 · G2 · G4
Fixed–pinned W27×84 transfer beam
LRFD · US customary
Use a compact, doubly symmetric section with adequate lateral restraint. Check bracing, local loads, load combinations, and project deflection criteria separately.
Entered values
Support condition
Fixed–pinned
Span L
31 ft
Section preset
W27×84
Yield stress Fᵧ
50 ksi
Uniform load w
3.5 kip/ft
Point load P
64 kip
Point location from left
38 %
Dead uniform load
1.28 kip/ft
Live uniform load
1.1 kip/ft
Dead point load
0 kip
Live point load
34 kip
Key results
Peak moment
799.056kip-ft
Peak shear
119.706kip
Total deflect.
0.4in
Available M
915kip-ft
Limit-state screening
Limit state
Demand
Available
Use
Flexural yielding
799.056 kip-ft
915 kip-ft
87.3%
Web shear
119.706 kip
368.46 kip
32.5%
Live deflection
0.267 in
1.033 in
25.8%
Total deflection
0.4 in
1.55 in
25.8%
Preliminary structural screening. A licensed SE/PE must review results against the complete project specifications.
Worked solution at the starting values
Resolve the strength-load reactions. The left reaction is 119.706 kip and the right reaction is 52.794 kip.
Evaluate the peak absolute moment and shear. The demand is 799.056 kip-ft in bending and 119.706 kip in shear.
Integrate the service-load bending diagram with the selected Iₓ. Live deflection is 0.267 in and total deflection is 0.4 in.
Calculation basis
Use a compact, doubly symmetric section with adequate lateral restraint. Check bracing, local loads, load combinations, and project deflection criteria separately.
Span response
Solve beam equilibrium and integrate M/EI over the span. For fixed–pinned support, the right reaction enforces zero vertical movement at the pin. Demand uses the absolute peaks, including the fixed-end region and both sides of the point load.
Flexure and shear
The plastic yielding ceiling is Mₚ = FᵧZₓ. Available bending strength is 0.90Mₚ or Mₚ/1.67 when compactness is satisfied. Web shear is 0.6FᵧAᵥCᵥ. G2 uses Aᵥ = dtw and G4 uses the two clear HSS webs. Rolled I-shapes below the G2.1(a) threshold get φᵥ = 1.00 and Ωᵥ = 1.50. Other supported cases use 0.90 and 1.67.
Serviceability
Enter downward dead and live service loads separately. Include self-weight in the dead case when applicable. Live deflection is checked against L/360 and dead plus live against L/240; project criteria may differ. The model uses linear elastic flexure and neglects shear deformation.