Worked example · Hydrology
Commercial parking lot peak runoff
A paved retail parking lot drains through landscaped islands to one downstream inlet. Use the 5.6 in/hr design intensity for the selected duration.
Inputs
Catchment plan
Live resultsComposite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
Calculation results
- Peak flow
- 15.5 cfs
- Composite C
- 0.796
- Drainage area
- 3.45 acre
- Kirpich t꜀
- 4.15 min
- US-equivalent flow factor
- 1.00833
Worked calculation
Change only the paved area and watch composite C rise. The site outlet still needs its own collection and bypass check.
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.
The exact US factor is 121/120 and is displayed as 1.0083. SI uses Q = C i A / 360 with i in mm/hr and A in ha. The rounded US convention uses 1.000. Kirpich estimates the channel travel component. Add sheet and shallow concentrated travel where applicable, and verify local minimum durations and area limits.
More worked examples
Open the main calculatorCommercial parking lot peak runoff
Inputs
- Pavement area
- 2.8 acre
- Pavement runoff coefficient
- 0.92
- Landscape area
- 0.65 acre
- Landscape runoff coefficient
- 0.26
- Open ground area
- 0 acre
- Open ground runoff coefficient
- 0.2
- Rainfall intensity
- 5.6 in/hr
- US flow conversion
- Exact · 1.0083
- Flow-path length
- 410 ft
- Average path grade
- 1.4 %
Results
- Peak flow
- 15.5 cfs
- Composite C
- 0.796
- Drainage area
- 3.45 acre
- Kirpich t꜀
- 4.15 min
- US-equivalent flow factor
- 1.00833
Composite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.
Screening worksheet · Verify design using project criteria and site data.