Worked example · Hydrology
Interchange ramp and embankment runoff
A steep roadway ramp sheds runoff across an embankment and into a roadside channel. Use the path grade along the channel for Kirpich.
Inputs
Catchment plan
Live resultsComposite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
Calculation results
- Peak flow
- 7.02 cfs
- Composite C
- 0.61
- Drainage area
- 1.84 acre
- Kirpich t꜀
- 2.86 min
- US-equivalent flow factor
- 1.00833
Worked calculation
Double the path length to see how the 0.77 exponent affects travel time. Keep the Rational discharge inputs fixed for the comparison.
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.
The exact US factor is 121/120 and is displayed as 1.0083. SI uses Q = C i A / 360 with i in mm/hr and A in ha. The rounded US convention uses 1.000. Kirpich estimates the channel travel component. Add sheet and shallow concentrated travel where applicable, and verify local minimum durations and area limits.
More worked examples
Open the main calculatorInterchange ramp and embankment runoff
Inputs
- Pavement area
- 0.82 acre
- Pavement runoff coefficient
- 0.9
- Landscape area
- 0.72 acre
- Landscape runoff coefficient
- 0.41
- Open ground area
- 0.3 acre
- Open ground runoff coefficient
- 0.3
- Rainfall intensity
- 6.2 in/hr
- US flow conversion
- Exact · 1.0083
- Flow-path length
- 540 ft
- Average path grade
- 6.4 %
Results
- Peak flow
- 7.02 cfs
- Composite C
- 0.61
- Drainage area
- 1.84 acre
- Kirpich t꜀
- 2.86 min
- US-equivalent flow factor
- 1.00833
Composite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.