Rational Method Runoff Calculator
Estimate peak stormwater runoff from weighted land cover, design rainfall intensity and the longest drainage path.
Inputs
Catchment plan
Live resultsComposite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
Calculation results
- Peak flow
- 7.88 cfs
- Composite C
- 0.496
- Drainage area
- 3.75 acre
- Kirpich t꜀
- 5.56 min
- US-equivalent flow factor
- 1.00833
Method and assumptions
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.
The exact US factor is 121/120 and is displayed as 1.0083. SI uses Q = C i A / 360 with i in mm/hr and A in ha. The rounded US convention uses 1.000. Kirpich estimates the channel travel component. Add sheet and shallow concentrated travel where applicable, and verify local minimum durations and area limits.
Worked examples
Rational Method Runoff Calculator
Inputs
- Pavement area
- 1.2 acre
- Pavement runoff coefficient
- 0.9
- Landscape area
- 1.8 acre
- Landscape runoff coefficient
- 0.35
- Open ground area
- 0.75 acre
- Open ground runoff coefficient
- 0.2
- Rainfall intensity
- 4.2 in/hr
- US flow conversion
- Exact · 1.0083
- Flow-path length
- 680 ft
- Average path grade
- 1.8 %
Results
- Peak flow
- 7.88 cfs
- Composite C
- 0.496
- Drainage area
- 3.75 acre
- Kirpich t꜀
- 5.56 min
- US-equivalent flow factor
- 1.00833
Composite runoff estimate
Use rainfall intensity from the local IDF curve at the adopted design duration.
C = Σ(Aᵢ Cᵢ) / ΣAᵢ · Q = C i A × K · t꜀ = 0.0078 L⁰·⁷⁷ S⁻⁰·³⁸⁵ in minutes with L in ft.
Screening worksheet · Verify design using project criteria and site data.