Vacuum Chamber Pump-Down Time & Outgassing Floor

Estimate chamber evacuation time through roughing, Roots boost and high vacuum with a decaying wall load and steady leak floor.

Readout ↓

Inputs

Chamber and effective speeds
L
Pa
Pa
Pa
L/s
L/s
Roots booster
Pa
L/s
Walls, seals and leaks
m²
Pa·m³/(s·m²)
s
Age at the start of the high-vacuum stage.
Pa·m³/(s·m²)
Pa·m³/s

Live readout

Target vacuum met
Roughing time91.74sHigh-vac time115.4sTotal time207.1sUltimate floor1.422e-7PaS₁Backing70.8 sS₂Roots stage20.9 sS₃High vacuum115 sLog P · Pa vs log-spaced time (s)1.42e-70.121.01e5016.4242Roots cut-in1000 PaTarget P1e-4 PaFloor P1.42e-7 Pa
Roughing time
91.74 s
Backing-only roughing time
70.81 s
Boosted roughing time
20.92 s
High-vacuum stage
115.4 s
Time to target
207.1 s
Modeled ultimate pressure
1.422e-7 Pa
Wall throughput at target
1.785e-5 Pa·m³/s

    Model & assumptions

    Roughing stages

    t = (V/S) ln(Pₐ/Pᵦ)

    The backing pump runs above the Roots switch pressure. Use combined speed below the switch, until the high-vacuum pump takes over. Enter chamber-effective speeds for all stages.

    High-vacuum mass balance

    V dP/dt = A[q∞ + q₁(1 + t/t₁)⁻ᵅ] + Qₗ − SₑP

    The high-vacuum clock starts with wall age t₁. The solver integrates the decaying load with exponential chamber memory until pressure crosses the target. At α = 0 the reference wall rate is a steady load.

    Ultimate pressure

    P∞ = (Aq∞ + Qₗ)/Sₑ (α > 0)

    The model rejects a target at or below the ultimate pressure. With a decaying wall load, a target can sit above the floor and still take longer than the 10¹² s search horizon.