Outgassing & leak budget / Worked example
Helium Acceptance Gas Load Budget
A metal-sealed assembly uses the allowed helium tracer throughput as a separate conservative gas-load budget item.
Inputs
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6
Live readout
Target vacuum met- Total gas load
- 6.89e-8 Pa·m³/s
- Required effective speed
- 7.656 L/s
- Predicted base pressure
- 1.06e-6 Pa
- Candidate speed reserve
- 88.22%
Gas load ranking
| Source | Gas load | Share |
|---|---|---|
| He leakHelium leak allowance | 6e-8 Pa·m³/s | 87.08% |
| Surface 1316L, baked 24 h at 150 °C | 8.9e-9 Pa·m³/s | 12.92% |
| O-ringO-ring permeation | 0 Pa·m³/s | 0% |
Reading this example
Equal tracer throughput may differ from an air leak in service. Use the helium equivalence tool when a flow-regime assumption is warranted.
Model & assumptions
Material load
Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ
Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.
Pressure and speed
P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ
The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.