Outgassing & leak budget / Worked example

Helium Acceptance Gas Load Budget

A metal-sealed assembly uses the allowed helium tracer throughput as a separate conservative gas-load budget item.

Readout ↓

Inputs

Pressure target and fixed loads
Pa
L/s
Pa·m³/s
Pa·m³/s
Chamber surface 1
m²
Pa·m³/(s·m²)
Chamber surface 2
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6

Live readout

Target vacuum met
Total load6.89e-8Pa·m³/sNeeded speed7.656L/sBase pressure1.06e-6PaSpeed reserve88.22%Gas load by sourceChamberHe leak87.1%Surface 112.9%Speed demand / available speedDemand7.66 L/sAvailable65 L/sReserve88.2%
Total gas load
6.89e-8 Pa·m³/s
Required effective speed
7.656 L/s
Predicted base pressure
1.06e-6 Pa
Candidate speed reserve
88.22%

Gas load ranking

SourceGas loadShare
He leakHelium leak allowance 6e-8 Pa·m³/s 87.08%
Surface 1316L, baked 24 h at 150 °C 8.9e-9 Pa·m³/s 12.92%
O-ringO-ring permeation 0 Pa·m³/s 0%

    Reading this example

    Equal tracer throughput may differ from an air leak in service. Use the helium equivalence tool when a flow-regime assumption is warranted.

    Model & assumptions

    Material load

    Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ

    Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.

    Pressure and speed

    P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ

    The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.