Outgassing & leak budget / Worked example
Kapton Cable Bundle in High Vacuum
A dense cable bundle exposes 0.065 m² of Kapton inside a 2.1 m² baked chamber.
Inputs
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6
Live readout
Base pressure above target- Total gas load
- 6.621e-6 Pa·m³/s
- Required effective speed
- 1104 L/s
- Predicted base pressure
- 4.138e-5 Pa
- Candidate speed reserve
- -589.7%
Gas load ranking
| Source | Gas load | Share |
|---|---|---|
| Surface 2Kapton | 6.5e-6 Pa·m³/s | 98.17% |
| O-ringO-ring permeation | 8e-8 Pa·m³/s | 1.208% |
| Surface 1316L, baked 24 h at 150 °C | 2.1e-8 Pa·m³/s | 0.3172% |
| He leakHelium leak allowance | 2e-8 Pa·m³/s | 0.3021% |
Reading this example
The small polymer area can dominate the load. Compare a measured material rate before deciding whether to change routing or pump speed.
Model & assumptions
Material load
Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ
Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.
Pressure and speed
P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ
The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.