Outgassing & leak budget / Worked example
Elastomer Permeation-Limited Manifold
The small baked manifold has little metal area. Its elastomer permeation allowance is 3 × 10⁻⁷ Pa·m³/s.
Inputs
Chamber surface 3
Chamber surface 4
Chamber surface 5
Chamber surface 6
Live readout
Base pressure above target- Total gas load
- 3.033e-7 Pa·m³/s
- Required effective speed
- 50.55 L/s
- Predicted base pressure
- 1.083e-5 Pa
- Candidate speed reserve
- -80.54%
Gas load ranking
| Source | Gas load | Share |
|---|---|---|
| O-ringO-ring permeation | 3e-7 Pa·m³/s | 98.91% |
| Surface 1316L, baked 24 h at 150 °C | 2.3e-9 Pa·m³/s | 0.7583% |
| He leakHelium leak allowance | 1e-9 Pa·m³/s | 0.3297% |
Reading this example
Use a lower permeation assumption only with seal geometry, gas and temperature evidence. Surface bake alone changes little in this budget.
Model & assumptions
Material load
Qₜ = Σ Aᵢqᵢ + Qₚₑᵣₘ + Qₗ
Use exposed surface area and the specific rate at the same time, temperature and conditioning state. Add steady permeation and the leak allowance as separate loads.
Pressure and speed
P = Qₜ/Sₑ · Sᵣₑq = Qₜ/Pₜ
The Pareto list ranks each contributing load by its fraction of the total. Speed reserve is 1 − Sᵣₑq/Sₑ, using candidate chamber-effective speed.