WeibullMTBFLab · Engineering calculation
Industrial drive 99% mission success run
Plan a 48-hour independent start-and-run sequence for each drive. Target 99% mission reliability with 95% confidence and 240 devices.
More passing devices are needed
Inputs
- Demonstration method
- Binomial · zero failures
- Confidence or credibility CL
- 0.95 0–1
- Target mission reliability
- 0.99 0–1
- Mission length per device
- 48 h
- Test devices
- 240
Results
- Reliab. lower
- 98.75953619 %
- Upper FIT
- 260,046.2
- Fleet needed
- 299
- Time/device
- 48 h
- Entered exposure
- 11,520 device·h
- Required exposure
- 14,352 device·h
- Confidence or credibility CL
- 0.95
- Prior success count
- 0
- Entered fleet
- 240 devices
Pr(all n pass at R*) = (R*)ⁿCL is 0.95 and the target mission reliability is 0.99.N = ceil[ln(1−CL)/ln(R*)]The design needs 299 passing devices.Rₗ = (1−CL)¹⁄ⁿThe entered fleet gives a lower limit of 0.98759536.Equivalent FITᵤ = 10⁹ [−ln(Rₗ)] / mission hoursAt 48 hours per mission the exponential equivalent is 260,046.2 FIT.
The chi-square bound uses total observed time at risk. Enter actual exposure per slot, or its mean for unequal exposures. Success runs assume independent pass/fail missions. The Bayesian choice uses a uniform Beta(1, 1) prior.