Industrial automation case

PLC Bayesian success run

Use a uniform reliability prior and 60 all-pass device missions to demonstrate a 96% reliability target at 90% posterior credibility.

Inputs

0–1
0–1
h
PassFleet covers the required success run
Reliab. lower
96.2956%
Upper FIT
188,736
Fleet needed
56
Time/device
200h

Fleet size and time per device

Reliability test fleet size and time per device trade-offRequired time per device · log scale108897744014.2718.378Fleet size (devices) · log scaleRequiredEntered fleet

The trade-off holds the confidence target fixed. In success-run modes it assumes exponential equivalence across different mission lengths.

Download

Detailed results

Entered exposure
12,000 device·h
Required exposure
11,200 device·h
Confidence or credibility CL
0.9
Prior success count
1
Entered fleet
60 devices

Under the Beta(1, 1) prior the posterior after n passes is Beta(n+1, 1). The lower limit solves its cumulative probability at 1−CL.

Formula trace

  1. Posterior after n passes is Beta(n+1, 1)CL is 0.9 and the target mission reliability is 0.96.
  2. N = max(1, ceil[ln(1−CL)/ln(R*)] − 1)The design needs 56 passing devices.
  3. Rₗ = (1−CL)¹⁄⁽ⁿ⁺¹⁾The entered fleet gives a lower limit of 0.96295625.
  4. Equivalent FITᵤ = 10⁹ [−ln(Rₗ)] / mission hoursAt 200 hours per mission the exponential equivalent is 188,736.5 FIT.

Model assumptions

The chi-square bound uses total observed time at risk. Enter actual exposure per slot, or its mean for unequal exposures. Success runs assume independent pass/fail missions. The Bayesian choice uses a uniform Beta(1, 1) prior.

Method and sources

Related examples