Weibull · ALT · MTBF
Reliability engineering calculators
Calculate Weibull life, accelerate lab tests, and quantify the reliability of systems in service.
8 calculators 50 editable examples Runs offline
Calculators
Statistical tablesWeibull life
Model failure probability, hazard and B-life with a two- or three-parameter Weibull.
Accelerated testingArrhenius & Peck
Translate chamber exposure to field-equivalent device-hours and a zero-failure FIT bound.
Accelerated testingThermal cycling
Translate chamber cycles to field cycles with swing, frequency and peak-temperature factors.
System architectureSystem RBD
Estimate system survival and mean life for series, parallel, voting and standby designs.
Demonstration testingReliability test sizing
Size binomial or Bayesian success runs and time-terminated chi-square tests.
Service uptimeRepairable availability
Turn MTBF, repair and logistics times into annual downtime and uptime headroom.
Service inventoryPoisson spare parts
Size shelf stock for Poisson lead-time demand and see backlog and stock value.
Maintenance policyPreventive replacement
Find the cost-minimizing replacement age for a Weibull lifetime and two replacement costs.
Worked examples
Open a case to edit its assumptions and see the formulas and results update.