Industrial machinery case

Pump depot transient availability

A repair shop expects 1,200 hours of mean uptime and 16 hours of repair time with no separate logistics delay. Check the first two hours.

Inputs

h
h
h
%
h
FailOperational availability falls below SLA
Inherent Aᵢ
98.6842%
Operational Aₒ
98.6842%
Downtime/yr
115.263h/yr
Transient A(t)
99.8435%

Markov states and downtime budget

Two-state Markov transition, downtime budget and transient unavailabilityTwo-state repair modelUpDownFailure λRepair μAnnual downtime budget115 h actual43.8 h SLAMarkov transient · 1 − A(t)0%0.743%1.49%0326496Time (h)TransientSteady state

The transient curve starts fully up and uses active corrective repair. The SLA comparison uses operational downtime.

Download

Detailed results

Annual downtime
6,915.789 min/yr
Annual SLA budget
43.8 h/yr
SLA headroom
-71.46316 h/yr
Operational SLA tier
1 nines

Compare A(t) at two hours with Aᵢ. The curve approaches the steady state at rate λ+μ.

Formula trace

  1. Aᵢ = MTBF / (MTBF + MTTR)Corrective repair alone gives 98.68421053%.
  2. Aₒ = MTBF / (MTBF + MTTR + MDT)Additional downtime brings operational availability to 98.68421053%.
  3. Downtime/yr = 8,760 (1 − Aₒ)Annual downtime is 115.2632 hours or 6,915.789 minutes.
  4. A(t) = Aᵢ + (1−Aᵢ) exp[−(1/MTBF + 1/MTTR)t]Starting fully up, transient availability at 2 h is 99.84345697%.

Model assumptions

MTBF is mean uptime, excluding downtime. Enter only additional preventive and logistics downtime per uptime cycle in MDT. The two-state Markov model uses exponential up and repair durations.