Large-diameter pipe and wide dam spacing

A large-bore shop joint has a long purge chamber because the dams sit away from the weld preparation.

Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.

Inputs

Cylinder & torch
L
bar(g)
bar(g)
USD
L/min
Pipe purge chamber
mm
mm
L/min
ppm
ppm

Live weld sheet

Updated from inputs
Pipe purge cutawayTorch arc-on runtime 8.44 h. Torch gas cost per hour 14.21 USD/h. Planned purge duration 44.3 min. Model oxygen at planned time 528 ppm TORCH HOURS8.44hTORCH COST14.21USD/hPURGE TIME44.3minRESIDUAL O₂528ppm PIPE PURGE CUTAWAY Bore 598 mmFlow 35 L/minStainless PURGE O₂ TARGETPASS
Pass · within screen

Purge O₂ target · 528 ppm predicted vs 1,000 ppm target.

Result details

Torch arc-on runtime8.44 h
Torch gas cost per hour14.21 USD/h
Planned purge duration44.3 min
Model oxygen at planned time528 ppm
Usable cylinder free gas9.627 m³
Dam air volume0.2584 m³
Gas for planned purge1.5504 m³
Mixing exchanges to target5.35
Modeled time to target39.51 min
Gas cost per planned purge19.33 USD
Whole purges per cylinder6

Worked example

Starting inputs

Cylinder water volume
48 L
Gas Z factor
1.09
Full gauge pressure
230 bar(g)
Reserve gauge pressure
8.5 bar(g)
Cylinder refill cost
120 USD
Torch flow
19 L/min
Internal diameter
598 mm

Baseline results

Torch arc-on runtime
8.44 h
Torch gas cost per hour
14.21 USD/h
Planned purge duration
44.3 min
Model oxygen at planned time
528 ppm

6 exchanges of a 0.2584 m³ chamber at 35 L/min take 44.3 min. The mixed-gas estimate at that point is 528 ppm against a 1,000 ppm target.

Try it. Halving dam spacing halves chamber volume and purge time at the same flow and exchange count.

Calculation method

t = N · V / F · O₂(N) = Cᵢ + (209,000 − Cᵢ)e⁻ᴺ

The pressure estimate expands usable gauge pressure over 101.325 kPa to ambient volume at equal temperature, using a single approximate gas Z factor. Rated free gas uses the usable fraction of gauge pressure. Torch runtime assumes continuous set flow. Start/stop gas, leaks and purge consumption shorten available torch time.

Dam volume is π·ID²·L/4. The well-mixed model assumes fresh gas at the entered oxygen level and continuous vented displacement. The entered oxygen target belongs to your WPS. Use a calibrated oxygen meter at the weld to verify purge quality before and during welding.

Keep the purge chamber vented. Shielding gases can displace breathable oxygen around the work. Follow ventilation and confined-space requirements.