GMAW · GTAW
Titanium chamber with ten exchanges
A small titanium chamber is modeled with cleaner incoming gas and a shop target of 20 ppm.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsPurge O₂ target · 11.5 ppm predicted vs 20 ppm target.
Result details
| Torch arc-on runtime | 16.58 h |
|---|---|
| Torch gas cost per hour | 5.13 USD/h |
| Planned purge duration | 1.95 min |
| Model oxygen at planned time | 11.5 ppm |
| Usable cylinder free gas | 8.952 m³ |
| Dam air volume | 0.001 m³ |
| Gas for planned purge | 0.0097 m³ |
| Mixing exchanges to target | 9.36 |
| Modeled time to target | 1.82 min |
| Gas cost per planned purge | 0.09 USD |
| Whole purges per cylinder | 919 |
Worked example
Starting inputs
- Torch flow
- 9 L/min
- Pipe material
- Titanium
- Internal diameter
- 52.5 mm
- Dam-to-dam length
- 450 mm
- Purge gas flow
- 5 L/min
- Volume exchanges
- 10
- Incoming gas oxygen
- 2 ppm
Baseline results
- Torch arc-on runtime
- 16.58 h
- Torch gas cost per hour
- 5.13 USD/h
- Planned purge duration
- 1.95 min
- Model oxygen at planned time
- 11.5 ppm
10 exchanges of a 0.001 m³ chamber at 5 L/min take 1.95 min. The mixed-gas estimate at that point is 11.5 ppm against a 20 ppm target.
Try it. Check the oxygen margin at ten exchanges and verify the actual reading under the planned vent and joint setup.
Calculation method
t = N · V / F · O₂(N) = Cᵢ + (209,000 − Cᵢ)e⁻ᴺ
The pressure estimate expands usable gauge pressure over 101.325 kPa to ambient volume at equal temperature, using a single approximate gas Z factor. Rated free gas uses the usable fraction of gauge pressure. Torch runtime assumes continuous set flow. Start/stop gas, leaks and purge consumption shorten available torch time.
Dam volume is π·ID²·L/4. The well-mixed model assumes fresh gas at the entered oxygen level and continuous vented displacement. The entered oxygen target belongs to your WPS. Use a calibrated oxygen meter at the weld to verify purge quality before and during welding.
Keep the purge chamber vented. Shielding gases can displace breathable oxygen around the work. Follow ventilation and confined-space requirements.