Consumable estimating
Double V SAW heavy plate seam
A heavy shop splice can be welded from both sides with submerged arc welding. The total unprepared root face is 4 mm.
Engineering screening only. Verify the applicable code, material and qualified WPS/PQR before production use.
Inputs
Live weld sheet
Updated from inputsCost allowance · Filler + labor vs 300 USD.
Result details
| Filled cross-section | 584.617 mm² |
|---|---|
| Filler to purchase | 25.288 kg |
| Arc-on time | 165.21 min |
| Filler and labor cost | 389.15 USD |
| Base weld section | 512.822 mm² |
| Deposited volume | 3,156.93 cm³ |
| Theoretical deposited mass | 24.782 kg |
| Consumable loss | 0.506 kg |
| Deposition efficiency | 98 % |
| Net deposition rate | 9 kg/h |
| Gross consumption rate | 9.18 kg/h |
| Paid shop time | 266.47 min |
| Filler cost | 113.79 USD |
| Labor cost | 275.35 USD |
| Budget margin | -89.15 USD |
Worked example
Starting inputs
- Weld profile
- Double V groove
- Plate thickness
- 40 mm
- Root gap
- 2.5 mm
- Total root face
- 4 mm
- Groove angle
- 65 °
- Seam length
- 5.4 m
- Extra weld area
- 14 %
Baseline results
- Filled cross-section
- 584.617 mm²
- Filler to purchase
- 25.288 kg
- Arc-on time
- 165.21 min
- Filler and labor cost
- 389.15 USD
A filled section of 584.617 mm² over 5.4 m deposits 24.782 kg. At 98 % process yield, allow 25.288 kg of consumables.
Try it. Switch to a single V at the same angle and gap. The bevel component doubles because one groove extends through the full prepared depth.
Calculation method
A = A₀(1 + r) · m = ρAL · mᵦ = m / ηd
An equal-leg fillet starts at w²/2 per side. A symmetric single V has section g·t + (t − f)²·tan(α/2). A balanced double V halves the bevel term at the same total root face. For a single bevel, use g·t + ½(t − f)²·tan(β). Reinforcement adds the entered percentage to the full base section.
The model assumes uniform density and a constant net deposition rate. Divide deposited mass by the process yield to estimate purchases. Divide arc-on time by the arc-on factor to obtain paid shop time. The cost screen compares filler plus labor against your allowance. Add gas, flux, setup or handling to your estimate separately.