Worked example · Vibrating Screen

Second deck with OEM rating

A quarry supplies a per-area base rating for the selected opening at reference conditions. The rating overrides the aperture curve.

Live results

Screen deck and material split

Edit inputs
Screen deck and material split Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. DECK AREA67.26ft²PASS EFF.96.13%UNDERSIZE123.14TPHOVERSIZE86.86TPH VIBRATING DECKMATERIAL SPLITOpening 0.63 inWet sprayFeed210 TPHOversize86.86 TPHUndersize123.14 TPHSecond deck Required / installed area92.14%Installed deck meets the estimated target area.

Installed deck meets the estimated target area.

All calculated values
Required live deck area
67.263ft²
Estimated passing efficiency
96.127%
Undersize product
123.139TPH
Oversize product
86.861TPH
True undersize in feed
128.1TPH
Undersize retained on deck
4.961TPH
Deck area at 90% recovery
51.7ft²
Aperture base capacity
1.85TPH/ft²
Corrected unit capacity
2.478TPH/ft²
Oversize correction
1.07
Half-size correction
1.04
Deck position correction
0.9
Wet screening correction
1.216
Density correction
1.1

Inputs

Unit system
Operating inputs
TPH
%
%
Percent of total feed smaller than half the selected aperture.
in
lb/ft³
ft²
%
Drive & model factors
TPH/ft²
0 uses the aperture curve. Enter the passing capacity per unit area at the stated reference conditions.

Worked solution

Starting case in US units

  1. Apply the 61% undersize fraction to the 210 TPH feed, giving 128.1 TPH of true undersize.
  2. The corrected unit capacity is 2.48 TPH/ft². The area required for 95% passing efficiency is 67.26 ft².
  3. With 73 ft² installed, predicted passing efficiency is 96.13%, splitting into 123.14 TPH passing and 86.86 TPH retained.

Try it. Compare the 90% reference area with the area needed for 95% recovery. Higher recovery requires additional active area.

More worked examples

Open a different starting case

Equations and assumptions

Aperture rating and corrections

C = C₀ · Fo · Fh · Fd · Fw · Fρ

The default C₀ is 2.2 × aperture(in)^0.55 short tons/h/ft². Reference conditions are 25% oversize, 40% half-size, 100 lb/ft³, top deck, dry screening and 90% recovery. Fo = 1 + 0.5(oversize fraction − 0.25), Fh = 1 + (half-size fraction − 0.40), and Fd = 1/0.9/0.8 by deck position (top/second/third respectively). Wet spray uses Fw = 1 + 0.3/(1 + aperture(in)²). Fρ scales with bulk density. The curve and corrections are illustrative VSMA-style estimates. Use an OEM rating and validate motion, media open area, bed depth and blinding before selection.

Live area and passing efficiency

A₉₀ = Qfeed · fᵤ / C   |   E = 1 − 0.1^(Ainstalled/A₉₀)
Arequired = A₉₀ · ln(1 − Etarget) / ln(0.1)

fᵤ is the fraction smaller than the aperture. This first-pass recovery curve is anchored at 90% for A₉₀. Its estimated recovery depends on the installed live area. Use a sampled and weighed feed and product mass balance to establish plant efficiency.

Stream split

Qpassing = Qfeed · fᵤ · E   |   Qretained = Qfeed − Qpassing

This model assumes coarse particles remain above the aperture. The oversize product includes unrecovered fines. Feed, passing and retained rates use the same mass basis.

References