Worked example · Vibrating Screen

Wet sand on a second deck

Wash sprays help separate sand at a fine second-deck aperture. The feed contains a high proportion of particles below half-size.

Live results

Screen deck and material split

Edit inputs
Screen deck and material split Four live readings and a schematic of the selected material-handling configuration. Full values follow the diagram. DECK AREA103.32ft²PASS EFF.87.24%UNDERSIZE102.77TPHOVERSIZE52.23TPH VIBRATING DECKMATERIAL SPLITOpening 0.25 inWet sprayFeed155 TPHOversize52.23 TPHUndersize102.77 TPHSecond deck Required / installed area129.15%Installed deck is below the estimated target area.

Installed deck is below the estimated target area.

All calculated values
Required live deck area
103.323ft²
Estimated passing efficiency
87.242%
Undersize product
102.771TPH
Oversize product
52.229TPH
True undersize in feed
117.8TPH
Undersize retained on deck
15.029TPH
Deck area at 90% recovery
89.465ft²
Aperture base capacity
1.026TPH/ft²
Corrected unit capacity
1.317TPH/ft²
Oversize correction
0.995
Half-size correction
1.14
Deck position correction
0.9
Wet screening correction
1.282
Density correction
0.98

Inputs

Unit system
Operating inputs
TPH
%
%
Percent of total feed smaller than half the selected aperture.
in
lb/ft³
ft²
%
Drive & model factors
TPH/ft²
0 uses the aperture curve. Enter the passing capacity per unit area at the stated reference conditions.

Worked solution

Starting case in US units

  1. Apply the 76% undersize fraction to the 155 TPH feed, giving 117.8 TPH of true undersize.
  2. The corrected unit capacity is 1.32 TPH/ft². The area required for 93% passing efficiency is 103.32 ft².
  3. With 80 ft² installed, predicted passing efficiency is 87.24%, splitting into 102.77 TPH passing and 52.23 TPH retained.

Try it. Switch from Wet with spray to Dry. Compare the correction applied to unit capacity and the resulting area estimate.

More worked examples

Open a different starting case

Equations and assumptions

Aperture rating and corrections

C = C₀ · Fo · Fh · Fd · Fw · Fρ

The default C₀ is 2.2 × aperture(in)^0.55 short tons/h/ft². Reference conditions are 25% oversize, 40% half-size, 100 lb/ft³, top deck, dry screening and 90% recovery. Fo = 1 + 0.5(oversize fraction − 0.25), Fh = 1 + (half-size fraction − 0.40), and Fd = 1/0.9/0.8 by deck position (top/second/third respectively). Wet spray uses Fw = 1 + 0.3/(1 + aperture(in)²). Fρ scales with bulk density. The curve and corrections are illustrative VSMA-style estimates. Use an OEM rating and validate motion, media open area, bed depth and blinding before selection.

Live area and passing efficiency

A₉₀ = Qfeed · fᵤ / C   |   E = 1 − 0.1^(Ainstalled/A₉₀)
Arequired = A₉₀ · ln(1 − Etarget) / ln(0.1)

fᵤ is the fraction smaller than the aperture. This first-pass recovery curve is anchored at 90% for A₉₀. Its estimated recovery depends on the installed live area. Use a sampled and weighed feed and product mass balance to establish plant efficiency.

Stream split

Qpassing = Qfeed · fᵤ · E   |   Qretained = Qfeed − Qpassing

This model assumes coarse particles remain above the aperture. The oversize product includes unrecovered fines. Feed, passing and retained rates use the same mass basis.