- Clear sash width
- 1.8 m
- Working height
- 500 mm
- Reduced height
- 320 mm
- Target face velocity
- 0.48 m/s
- Exhaust control
- Variable air volume (VAV)
- Unoccupied VAV flow
- 25 %
- Occupied hours per year
- 6,200 h
- Heating degree-hours
- 50,000 °C·h
- Cooling degree-hours
- 16,666.7 °C·h
- Heating efficiency
- 0.9
- Cooling COP
- 3.2
- Heating input energy rate
- 0.14 /kWh
- Cooling input energy rate
- 0.28 /kWh
- Cost display currency
- EUR · Euro
Results
- Working flow
- 1,555.2 m³/h
- Reduced flow
- 995.328 m³/h
- Energy saved
- 8,074.18 kWh
- Cost saved
- 1,227.28 EUR
- Working face velocity
- 0.48 m/s
- Reduced face velocity
- 0.48 m/s
- Unoccupied exhaust
- 388.8 m³/h
- Annual mean flow, working
- 1,214.33 m³/h
- Annual mean flow, reduced
- 818.078 m³/h
- Working heating input
- 22,622.6 kWh
- Working cooling input
- 2,120.87 kWh
- Working total energy
- 24,743.5 kWh
- Reduced total energy
- 16,669.3 kWh
- Working annual cost
- 3,761.01 EUR
- Reduced annual cost
- 2,533.73 EUR
The sash comparison uses a shared VAV minimum. Verify containment at both operating positions.
For preliminary engineering and EHS / Industrial Hygiene review. Design calculations do not replace review by a licensed professional engineer (PE) and a certified industrial hygienist (CIH), commissioning tests, ISO 14644 classification or certification, or assessment against the applicable NFPA 86 edition.
https://calcsheetlab.com/cleanroomventlab/laboratory-fume-hood-airflow-cost-calculator/extended-hours-vav/