Worked example · Thermal packaging

Compact VIP dry-ice pack-out

A compact dry-ice pack-out uses high-performance panels and a small initial charge.

Reserve hold
39.29h
Heat leak
7.91W
Coolant use
0.05kg/h
Nominal hold
56.12h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg

Dry ice releases CO₂. Use packaging designed to vent it and follow the applicable handling and shipping requirements.

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient27 °CPayload target-32 °CHeat leak 7.9 WLatent-energy budget0 h56.12 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
0.36m²
Wall R-value
2.67m²·K/W
Latent energy available
1,599kJ
Phase-change enthalpy
571kJ/kg
Coolant phase temperature
-78.5°C
Hold time set aside
16.84h
Ambient-to-payload difference
59K
Heat leak with cavity at coolant phase temp.
14.15W

Work through this case

  1. Mid-wall heat-transfer area 0.36m²
  2. Wall R-value 2.67m²·K/W
  3. Reserve hold 39.29h

Volume and face area both matter. Check the heat-leak sensitivity when the thin assembly allowance includes thermal bridging around the lid.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What should I check in the compact vip dry-ice pack-out example?

Volume and face area both matter. Check the heat-leak sensitivity when the thin assembly allowance includes thermal bridging around the lid.