Thermal packaging

Dry Ice & Insulated Shipper Hold-Time Calculator

Estimate six-wall heat leak, dry ice sublimation or gel-pack melt rate, and reserve-adjusted hold time for an insulated cold-chain shipper.

Reserve hold
29.21h
Heat leak
32.58W
Coolant use
0.205kg/h
Nominal hold
38.95h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg

Dry ice releases CO₂. Use packaging designed to vent it and follow the applicable handling and shipping requirements.

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient30 °CPayload target-20 °CHeat leak 32.6 WLatent-energy budget0 h38.95 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
1.21m²
Wall R-value
1.86m²·K/W
Latent energy available
4,568kJ
Phase-change enthalpy
571kJ/kg
Coolant phase temperature
-78.5°C
Hold time set aside
9.74h
Ambient-to-payload difference
50K
Heat leak with cavity at coolant phase temp.
70.7W

Worked examples

Open a case with its assumptions loaded, then edit the inputs.

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What happens if a dry-ice cavity runs much colder than the payload?

The temperature driving heat through the walls increases. Compare the readout for a cavity at the coolant phase temperature and use measured pack-out data for qualification.

How does the reserve affect the predicted hold time?

The reserve sets aside the specified percentage of the coolant’s latent energy. Seams, thermal bridges, venting, and variable temperatures can consume that margin.