Worked example · Thermal packaging

Chilled EPS shipper in a warm dwell

A chilled pack-out with 0 °C coolant is screened under a continuous warm ambient exposure.

Reserve hold
13.09h
Heat leak
15.96W
Coolant use
0.174kg/h
Nominal hold
21.82h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg
kJ/kg

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient39 °CPayload target4 °CHeat leak 16 WLatent-energy budget0 h21.82 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
0.72m²
Wall R-value
1.57m²·K/W
Latent energy available
1,254kJ
Phase-change enthalpy
330kJ/kg
Coolant phase temperature
0°C
Hold time set aside
8.73h
Ambient-to-payload difference
35K
Heat leak with cavity at coolant phase temp.
17.79W

Work through this case

  1. Ambient-to-payload difference 35K
  2. Hold time set aside 8.73h
  3. Reserve hold 13.09h

This run assumes the entire dwell occurs at the stated ambient. Shorter hot exposures or a moving profile need a segmented qualification plan.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What should I check in the chilled eps shipper in a warm dwell example?

This run assumes the entire dwell occurs at the stated ambient. Shorter hot exposures or a moving profile need a segmented qualification plan.