R = thickness / k • Q = A × (Tambient − Tpayload) / R
Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.
Coolant consumption
Rate = 3.6 × Q(W) / L(kJ/kg)
Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.
Reserve and qualification
treserve = m / rate × (1 − reserve fraction)
Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.
What should I check in the chilled eps shipper in a warm dwell example?
This run assumes the entire dwell occurs at the stated ambient. Shorter hot exposures or a moving profile need a segmented qualification plan.
ColdChainLab · Engineering calculation
Chilled EPS shipper in a warm dwell
Metric SI · https://calcsheetlab.com/coldchainlab/dry-ice-shipper-hold-time/warm-dwell-chilled-eps/
Inputs
Interior length
0.38 m
Interior width
0.25 m
Interior height
0.25 m
Insulation thickness
55 mm
Insulation preset
Expanded polystyrene (EPS)
Effective conductivity
0.035 W/(m·K)
Ambient temperature
39 °C
Payload target temperature
4 °C
Latent-energy reserve
40 %
Coolant
Phase-change pack (0 °C)
Coolant mass
3.8 kg
Pack enthalpy at phase change
330 kJ/kg
Results
Reserve hold
13.09h
Heat leak
15.96W
Coolant use
0.174kg/h
Nominal hold
21.82h
Mid-wall heat-transfer area
0.72m²
Wall R-value
1.57m²·K/W
Latent energy available
1,254kJ
Phase-change enthalpy
330kJ/kg
Coolant phase temperature
0°C
Hold time set aside
8.73h
Ambient-to-payload difference
35K
Heat leak with cavity at coolant phase temp.
17.79W
Use these estimates for preliminary engineering. Verify results against validated cold-chain qualification protocols, applicable ASHRAE Standards 15 and 34, and local food and pharmaceutical regulations. Use manufacturer data, measured operating conditions, and approved acceptance criteria before acting on a result.