Worked example · Thermal packaging

VIP shipper with 0 °C phase-change packs

A vacuum-panel shipper uses phase-change packs for a cool payload. The model uses an effective assembly conductivity.

Reserve hold
77.91h
Heat leak
2.61W
Coolant use
0.031kg/h
Nominal hold
103.89h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg
kJ/kg

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient29 °CPayload target5 °CHeat leak 2.6 WLatent-energy budget0 h103.89 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
0.52m²
Wall R-value
4.75m²·K/W
Latent energy available
976kJ
Phase-change enthalpy
305kJ/kg
Coolant phase temperature
0°C
Hold time set aside
25.97h
Ambient-to-payload difference
24K
Heat leak with cavity at coolant phase temp.
3.15W

Work through this case

  1. Latent energy available 976kJ
  2. Heat leak 2.61W
  3. Reserve hold 77.91h

Panel joints can dominate the heat leak. Replace the preset conductivity with the measured assembly value and enter the supplier enthalpy.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What should I check in the vip shipper with 0 °c phase-change packs example?

Panel joints can dominate the heat leak. Replace the preset conductivity with the measured assembly value and enter the supplier enthalpy.