R = thickness / k • Q = A × (Tambient − Tpayload) / R
Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.
Coolant consumption
Rate = 3.6 × Q(W) / L(kJ/kg)
Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.
Reserve and qualification
treserve = m / rate × (1 − reserve fraction)
Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.
What should I check in the vip shipper with 0 °c phase-change packs example?
Panel joints can dominate the heat leak. Replace the preset conductivity with the measured assembly value and enter the supplier enthalpy.
ColdChainLab · Engineering calculation
VIP shipper with 0 °C phase-change packs
Metric SI · https://calcsheetlab.com/coldchainlab/dry-ice-shipper-hold-time/vip-phase-change-kit/
Inputs
Interior length
0.31 m
Interior width
0.24 m
Interior height
0.22 m
Insulation thickness
38 mm
Insulation preset
Vacuum panel assembly (VIP)
Effective conductivity
0.008 W/(m·K)
Ambient temperature
29 °C
Payload target temperature
5 °C
Latent-energy reserve
25 %
Coolant
Phase-change pack (0 °C)
Coolant mass
3.2 kg
Pack enthalpy at phase change
305 kJ/kg
Results
Reserve hold
77.91h
Heat leak
2.61W
Coolant use
0.031kg/h
Nominal hold
103.89h
Mid-wall heat-transfer area
0.52m²
Wall R-value
4.75m²·K/W
Latent energy available
976kJ
Phase-change enthalpy
305kJ/kg
Coolant phase temperature
0°C
Hold time set aside
25.97h
Ambient-to-payload difference
24K
Heat leak with cavity at coolant phase temp.
3.15W
Use these estimates for preliminary engineering. Verify results against validated cold-chain qualification protocols, applicable ASHRAE Standards 15 and 34, and local food and pharmaceutical regulations. Use manufacturer data, measured operating conditions, and approved acceptance criteria before acting on a result.