Worked example · Thermal packaging

EPS dry-ice seafood shipper

An EPS pack-out uses dry ice for frozen seafood during a warm ambient segment.

Reserve hold
28.09h
Heat leak
33.6W
Coolant use
0.212kg/h
Nominal hold
40.13h
Edit inputs

Inputs

Edit any value to recalculate.

Interior & insulation

Select a starting value for k or enter the tested value for the complete assembly.

m
m
m
mm
W/(m·K)
Thermal conditions
°C
°C
%
Coolant charge

Replace gel-pack defaults with a supplier’s measured phase-change enthalpy.

kg

Dry ice releases CO₂. Use packaging designed to vent it and follow the applicable handling and shipping requirements.

Heat leak and hold-time reserve

Heat leak and hold-time reserveThe reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.Ambient32 °CPayload target-18 °CHeat leak 33.6 WLatent-energy budget0 h40.13 h nominalAvailable holdEnergy held in reserve

The reserve is held back from the nominal cooling budget. The timeline assumes a constant ambient and cavity temperature.

Calculation breakdown

Mid-wall heat-transfer area
1.34m²
Wall R-value
2m²·K/W
Latent energy available
4,854kJ
Phase-change enthalpy
571kJ/kg
Coolant phase temperature
-78.5°C
Hold time set aside
12.04h
Ambient-to-payload difference
50K
Heat leak with cavity at coolant phase temp.
74.24W

Work through this case

  1. Heat leak 33.6W
  2. Heat leak with cavity at coolant phase temp. 74.24W
  3. Reserve hold 28.09h

Compare the reserve-adjusted hold estimate with the modeled colder-cavity heat leak. Use instrumented pack-out qualification to verify the time limit.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Six-face heat leak

R = thickness / k • Q = A × (Tambient − Tpayload) / R

Area is measured at the wall mid-plane using interior dimensions plus one wall thickness. This case assumes the cavity follows the payload target. The readout also shows the higher heat leak if the whole cavity approaches the coolant phase temperature.

Coolant consumption

Rate = 3.6 × Q(W) / L(kJ/kg)

Dry ice uses 571 kJ/kg, about 246 BTU/lb, at −78.5 °C. The 0 °C and −21 °C phase-change pack enthalpies are adjustable starting values.

Reserve and qualification

treserve = m / rate × (1 − reserve fraction)

Budget for seams, bridges, air exchange, payload preconditioning, and ambient extremes. Verify the actual pack-out by an instrumented test against its approved qualification protocol and payload limits.

References

Questions and answers

What should I check in the eps dry-ice seafood shipper example?

Compare the reserve-adjusted hold estimate with the modeled colder-cavity heat leak. Use instrumented pack-out qualification to verify the time limit.