Worked example · Facility sizing

Pre-chilled floral holding cooler

A flower cooler receives product close to the room setpoint and carries almost no daily product heat.

Sized capacity
1.32kW
Refrig. tons
0.38TR
24-hour load
0.99kW
Product load
0kW
Edit inputs

Inputs

Edit any value to recalculate.

Room envelope

Use assembly R-values. The floor can have a different boundary temperature.

m
m
m
°C
°C
°C
m²·K/W
m²·K/W
m²·K/W
Door air exchange

One exchange replaces one room volume. Enter effective daily exchanges after door controls.

changes/day
%
%
Product cooling
kg/day
°C
°C
kJ/(kg·K)
kJ/(kg·K)
kJ/kg
h
Internal loads & runtime

This sizing screen uses 16–20 available compressor hours per day.

kW
h/day
kW
h/day
kW
h/day
kW
h/day
%
h/day

Heat entering the walk-in

Heat entering the walk-inThe stacked bar shows positive average gains. The sizing capacity also accounts for runtime and the product cooling window.Surrounding air25 °CRoom setpoint3 °CVolume 32.8 m³Positive gains / 24-hour averagePanelsDoor airProductInternal

The stacked bar shows positive average gains. The sizing capacity also accounts for runtime and the product cooling window.

Calculation breakdown

Four walls
0.18kW
Ceiling
0.05kW
Floor
0kW
Net panel transmission
0.24kW
Door infiltration incl. moisture
0.25kW
Product heat per day
0kJ
Lighting heat
0.08kW
Fan heat
0.38kW
Occupant heat
0.04kW
Retained defrost heat
0kW
Runtime-adjusted capacity
1.32kW
Product-window capacity
0.99kW
Inside box volume
32.76m³

Work through this case

  1. Product load 0kW
  2. Fan heat 0.38kW
  3. 24-hour load 0.99kW

The cooler still has panel, door, and equipment gains. Use the short fan off-time and the observed occupancy in the heat budget.

More worked examples

Open a case with its assumptions loaded, then edit the inputs.

Open base calculator

Formulas and assumptions

Panel transmission

Q = Σ[A × (Tₒᵤₜ − Tᵣₒₒₘ) / R]

Area covers four walls, a ceiling, and a floor. Each assembly U-value is 1/R. A colder adjacent boundary can contribute a cooling credit.

Door infiltration

Q = V × exchanges/day × ρda × Δh / 86,400

The air-change method uses the entering dry-air density and moist-air enthalpy difference at standard atmospheric pressure. In a freezer it adds freezing heat for moisture removed from the incoming air. This is a daily screening estimate.

Product cooling and internal loads

E = m × (c₊ΔT₊ + Lf + c₋ΔT₋)

The fusion term applies to product crossing below its freezing point. Lighting, fans, occupancy and retained defrost heat are averaged over 24 hours. Respiration heat for living produce can be estimated with the produce tool and carried as an additional load in a detailed design.

Compressor sizing

Qsize = max(Qavg × 24 / runtime, Qbase + E / cooling window)

Use consistent energy and time units. One refrigeration ton is 12,000 BTU/h. Confirm equipment at the selected evaporating and condensing conditions.

References

Questions and answers

What should I check in the pre-chilled floral holding cooler example?

The cooler still has panel, door, and equipment gains. Use the short fan off-time and the observed occupancy in the heat budget.