OSHA 1926.1432 · Multiple cranes

Balanced tandem vessel set

Two cranes support a 100,000 lb vessel at equal horizontal lever arms. The beam CG is centered and each hook carries its own block.

Inputs

Payload and beam
lb
ft
ft
lb
%
Projected horizontal position, 0% at A and 100% at B.
Chart at worst lift position
lb
lb
lb
lb
Back to results ↑

Results

Static screeningEdit inputs ↓
Dual-hook free-body sketchCRANE A LOAD53,500lbCRANE B LOAD53,400lbA CAP MARGIN17,750lbB CAP MARGIN11,850lbCRANE ACRANE BPAYLOAD CG / HOOK SPANA / 75% chart cap75.09%B / 75% chart cap81.84%Crane ACrane BPayload centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results

Compare these results with the approved equipment and lift plan.

Gross demand on crane A
53,500 lb
Gross demand on crane B
53,400 lb
Crane A margin to 75% cap
17,750 lb
Crane B margin to 75% cap
11,850 lb
Crane A chart capacity used
56.32 %
Crane B chart capacity used
61.38 %
Combined lifted weight
106,900 lb

The payload reactions are equal. Compare the two gross chart utilizations when the cranes have different chart capacities.

Gross demand on crane A 53,500 lb · Gross demand on crane B 53,400 lb

Payload reactions

Wₐ = W × b/(a + b), Wᵦ = W × a/(a + b)

Use projected horizontal distances from CG to the vertical lines. For unrotated lug coordinates, rotate them to the specified attitude before resolving reactions.

Gross hook demands

Gross share = payload share + beam share + hook gear

Use the beam CG location for its share. With gross chart capacities, include each hook block and applicable chart deductions once in gear.

Screening margin

Margin = 0.75 × chart capacity − gross share

The 75% cap is this tool’s planning assumption. Site procedures and the actual OEM load chart govern.

Use the weakest chart point at each actual radius, boom configuration and set-up. A qualified person must plan the lift under OSHA 1926.1432 where it applies. This is a static snapshot for vertical lines. Review dynamic load transfer and any off-plumb line separately.