OSHA 1926.1432 · Multiple cranes

Transformer with dissimilar crane capacities

A 38,000 kg transformer is supported 5 m and 6 m either side of the CG. Chart capacity is lower for crane B.

Inputs

Payload and beam
kg
m
m
kg
%
Projected horizontal position, 0% at A and 100% at B.
Chart at worst lift position
kg
kg
kg
kg
Back to results ↑

Results

Static screeningEdit inputs ↓
Dual-hook free-body sketchCRANE A LOAD21,827.27kgCRANE B LOAD18,872.73kgA CAP MARGIN8,172.73kgB CAP MARGIN627.27kgCRANE ACRANE BPAYLOAD CG / HOOK SPANA / 75% chart cap72.76%B / 75% chart cap96.78%Crane ACrane BPayload centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results

Compare these results with the approved equipment and lift plan.

Gross demand on crane A
21,827.27 kg
Gross demand on crane B
18,872.73 kg
Crane A margin to 75% cap
8,172.73 kg
Crane B margin to 75% cap
627.27 kg
Crane A chart capacity used
54.57 %
Crane B chart capacity used
72.59 %
Combined lifted weight
40,700 kg

The higher raw load and higher utilization can occur on different cranes. Compare both gross shares and their own caps.

Gross demand on crane A 21,827.27 kg · Gross demand on crane B 18,872.73 kg

Payload reactions

Wₐ = W × b/(a + b), Wᵦ = W × a/(a + b)

Use projected horizontal distances from CG to the vertical lines. For unrotated lug coordinates, rotate them to the specified attitude before resolving reactions.

Gross hook demands

Gross share = payload share + beam share + hook gear

Use the beam CG location for its share. With gross chart capacities, include each hook block and applicable chart deductions once in gear.

Screening margin

Margin = 0.75 × chart capacity − gross share

The 75% cap is this tool’s planning assumption. Site procedures and the actual OEM load chart govern.

Use the weakest chart point at each actual radius, boom configuration and set-up. A qualified person must plan the lift under OSHA 1926.1432 where it applies. This is a static snapshot for vertical lines. Review dynamic load transfer and any off-plumb line separately.