ASME B30.5 · OSHA 1926.1414

Eight-part block with roller bearings

An 86 metric t hook load uses eight supporting parts and a single lead wrap. The rope maker supplies a 690 kN MBS.

Inputs

Hook load and reeving
metric t
kN
Sheave and drum
mm
mm
:1
mm
m
mm
Back to results ↑

Results

Static screeningEdit inputs ↓
Block reeving and drum leadFAST-LINE PULL115.33kNROPE FACTOR5.98:1SHEAVE D/d22.5:1FLEET ANGLE1.3°FIXED BLOCKTRAVELING BLOCKFast lineDead endD/d 22.5Fleet 1.3°Rope pull limit83.57%Required / actual D/d80%Fleet angle limit64.79%Running ropeFast lineBlock centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results

Compare these results with the approved equipment and lift plan.

Estimated fast-line pull
115.33 kN
Available rope design factor
5.98 :1
Sheave pitch to rope diameter
22.5 :1
Worst drum fleet angle
1.3 °
Friction-adjusted parts
7.31
Overall reeving efficiency
91.41 %
Rope pull at entered design factor
138 kN

Check the compounded effective parts and the resulting available design factor. Verify the winch rating at working layer.

Estimated fast-line pull 115.33 kN · Available rope design factor 5.98 :1

Effective parts

Nₑ = ηᵏ × Σ ηⁱ, i = 0 to N − 1

η is efficiency per wrap. k counts lead sheaves before the first supporting part. Fast-line pull is suspended weight divided by Nₑ.

Rope and sheave

Design factor = MBS / P; D/d = Dpitch / drope

Use the rope maker’s minimum breaking strength and the OEM’s minimum pitch-diameter ratio.

Fleet angle

β = atan((drum width/2 + |offset|) / lead)

Use the furthest first-layer winding position. Compare with 1.5° smooth or 2.0° grooved as the entered drum-type screen.

Compare line pull with the OEM winch rating at the working drum layer and confirm compatible reeving, rope construction, termination efficiency and sheave sizing. A 3.5:1 design factor requires equipment- and use-specific review under the applicable OSHA provisions.