ASME B30.5 · OSHA 1926.1414

Single-part line with no extra lead sheave

A 9,200 lb suspended load hangs from one supporting rope part with no additional lead wrap.

Inputs

Hook load and reeving
lb
lbf
Sheave and drum
in
in
:1
in
ft
in
Back to results ↑

Results

Static screeningEdit inputs ↓
Block reeving and drum leadFAST-LINE PULL9,200lbfROPE FACTOR6.09:1SHEAVE D/d20:1FLEET ANGLE1.47°FIXED BLOCKTRAVELING BLOCKFast lineDead endD/d 20Fleet 1.47°Rope pull limit82.14%Required / actual D/d90%Fleet angle limit73.44%Running ropeFast lineBlock centerlineLift screening only · verify with rigger / PE and OEM chart

Schematic geometry. Margin bars mark 100% of the entered limit.

Screening results

Compare these results with the approved equipment and lift plan.

Estimated fast-line pull
9,200 lbf
Available rope design factor
6.09 :1
Sheave pitch to rope diameter
20 :1
Worst drum fleet angle
1.47 °
Friction-adjusted parts
1
Overall reeving efficiency
100 %
Rope pull at entered design factor
11,200 lbf

In this idealized layout the fast line carries the whole load. Check the rope design factor and winding geometry independently.

Estimated fast-line pull 9,200 lbf · Available rope design factor 6.09 :1

Effective parts

Nₑ = ηᵏ × Σ ηⁱ, i = 0 to N − 1

η is efficiency per wrap. k counts lead sheaves before the first supporting part. Fast-line pull is suspended weight divided by Nₑ.

Rope and sheave

Design factor = MBS / P; D/d = Dpitch / drope

Use the rope maker’s minimum breaking strength and the OEM’s minimum pitch-diameter ratio.

Fleet angle

β = atan((drum width/2 + |offset|) / lead)

Use the furthest first-layer winding position. Compare with 1.5° smooth or 2.0° grooved as the entered drum-type screen.

Compare line pull with the OEM winch rating at the working drum layer and confirm compatible reeving, rope construction, termination efficiency and sheave sizing. A 3.5:1 design factor requires equipment- and use-specific review under the applicable OSHA provisions.

Other worked examples